THE BRITISH OVERSEAS RAILWAYS HISTORICAL TRUST
|
Locomotive Magazine Volume 19 (1913)
No. 245 (15 January 1913)
Railway notes. 1
Great Central Ry. 1 illus.
No. 423 Sir Sam Fay large inside-cylinder 4-6-0 (mentioned
in September Issue) had 21½ x 26in cylinders (the largest diameter in
an inside cylinder locomotive), 10in piston valves, 6ft 9in coupled wheels,
a 5ft 6in Belpaire boiler with 2816ft2 total heating surface,
26ft2 grate area and 160 psi boiler pressure. New 4-6-2Ts Nos.
449 and 450 placed in service. No. 1072, fish traffic engine, fitted with
Schleyer patented ash consuming apparatus in which char removed from smokebox
and drawn into firebox by vacuum.
Zafra-Huelva Ry., Spain. 1.
H.A.W. Langdon appointed locomotive superintendent. Langdon had been
apprenticed to Weatherburn at Kentish Town, and in 1903 went to Venezuela
as locomotive superintendent of the Bolivar Railway, from which he had resigned
to mve to Spain.
London & South Western Ry. 2.
Eight of No. 470 type 4-4-0 (No. 463 illustrated in April Issue) with
Walschaerts vale gear and 19½in cylinders had been manufacured at
Eastleigh.
Great Western Ry. 2.
Staff appointments
H.C. King, formerly works manager at Swindon became assistant to locomotive
superintendent
C.B. Collett, formerly assistant works manager to works manager
W.A. Stanier, formerly district locomotive superintendent, Swindon, to assistant
works manager
W.H. Waister, head of running department to retire and replaced by W.H.
Williams
J.A. Robinson, locomotive superintendent Wolverhampton also took over Williams'
former responsibilities
J.W.A. Kislingbury in charge of Old Oak Common moved to be locomotive
superintendent Wolverhampton
E.G. Ireland district locomotive superintendent Worcester to district locomotive
superintendent, Swindon
E.G. Wainwright, assistant dls at Wolverhampton to district locomotive
superintendent Worcester
New 42XX 2-8-0T Nos. 4216-4220 with superheaters entered service. On 18 December
1912 365 locomotives had been renumbered including the early 2-cylinder 4-6-0s,
for instance No. 171 became No. 2972. Three hydraulic engine traversers had
been installed at Paddington station. New engine shed constructed at Maesglas
near Newport.
Great Eastern Ry. 2
H.F. Hilton, District Locomotive Superintendent Cambridge moved to
London Division in succession to C.W.L. Glaze. H.W.C. Drury moved from Doncaster
District to Cambridge and E. Duce to take over Doncaster, including
responsibility for York and Lincoln.
Metropolitan Ry Jubilee. 2
Bishop's Road to Farringdon Street opened on 10 January 1863: thus
Golden Jubilee. 9,500,000 passengers carried in first year. Notes original
use of gas lighting and broad gauge. Key dates are recorded of completion
of Inner Circle, extension to Verney Junction and planned extension to
Watford.
Vulcan Foundry Ltd. 2
Order placed by Great Indian Peninsular Railway for superheated 2-8-0
type.
North Staffordshire Ry. 2.
Superheated 4-4-2T Nos. 13 and 14 completed at Stoke Works.
Great Indian Peninsular Ry. 3. illus.
Vulcan Foundry superheated 4-6-0 (No. 405 illustrated) supplied to
requirements of S.J. Sarjant, locomotive superintendent, and Robert White
Consultant. The locomotives had 20½ x 26in outside cylinders, Walschaerts
valve gear; 6ft 2in coupled wheels, a telescopic boiler operating at 160
psi, 2012ft2 total heating surface including 407ft2
superheat and 32ft2 grate area. See also p.
115
London & North Western Ry. 3
New superheated 0-8-0 type Nos. 2289, 2301, 2374, 2380 and 2405 had
entered service. Precedent No. 514 Lawrence had been renamed Puck
and Jubilee No. 1931 T.H. Ismay had been renamed John o' Gaunt
to avoid confusion. No. 896 George Whale had been fitted with a mechanical
lubricator with a larger gauge glass and No. 865 Cossack had been fitted
with a Wakefield mechanical lubricator. No. 287, a 4ft 6in passenger tank
had been modified for motor tain work. Five Precursor 4-4-0s had been fitted
with superheaters: first was No. 7 Titan..
North British Ry. 3-4.
4-4-2Ts supplied Yorkshire Engine Co, WN 1066-76: RN allocated 3,
4, 5, 122. 131, 134, 135, 141, 155, 164. Running numbers 907-926 allocated
to 0-6-2Ts built North British Locomotive Co., Queen's Park Works: safety
valves above firebox rather than on dome.
Bombay, Baroda & Central India Ry. 4. illus.
Fridays P&O Special from Bombay Colaba Station to Delhi using
Nagla-Muttra route. Train left at Noon at reached Delhi in 24 hours 30 minutes
(869 miles). The train consisted of a restaurant car and two first class
vehicles runningnon six-eheel bogies and a third class car (on four wheel
bogies)
Dover Harbour works and Marine Station. 4.
North Eastern Railway: latest developments in the Locomotive,
Carriage and Wagon Departments. 6 et seq + plate. 3 ports.
Portraits: Vincent L. Raven (plate),
A.C. Stamer and
N.J. Lockyer.
North Eastern Railway's new offices in Darlington. 7-8. illus., 2 plans.
The North Eastern Ry. Company's new locomotive boiler shop, Stooperdale, Darlington. 8-11; 13. 4 illus., plan
Recent N.E.R. locomotives, Class "Z1" superheater engines, Atlantic type three cylinder. 12; 13-14. 2 illus.
N.E.R. class "S2" superheater engine 4-6-0 type. 12; 14.
N.E.R. side tank engine for heavy mineral traffic class "Y". 15. diagr.(s.
el.)
3-cylinder 4-6-2T
The thousandth locomotive built at Trollhatan Works. 15. illus.
Swedish State Railways No. 1240 built by Nydquist & Holm who issued
a 200 page souvenir history.
The locomotives of the Great Eastern Railway. 16.
Then new type having the 4-6-0 wheel arrangement with inside cylinders,
intended for heavy express service (Fig. 248), the coupled wheels having
a diameter of 6ft. 6in. and the bogie 3ft. 3in. The cylinders were 20in.
by 28in. and the wheelbase 28ft. 6in., of which the coupled base is 14ft.
equally divided, the bogie base 6ft. 6in. and the distance from bogie pin
to driving centre 11ft. 3in. The boiler was fitted with the Schmidt superheater
and carried a pressure of 180 psi was of the following large proportions:
maximum inside diameter 5ft., total heating surface 1919ft2.;
grate area 26.5ft2 Piston valves were provided, these being the
first on the G.E.R. to have them. No. 1500 was turned out in December, 1911
and Nos. 1501 to 1504 in 1912. Previous part
Volume 18 page 250. 4-6-0
L. Wiener. The locomotives of the Rio Grande do Sul
Railway, Brazil. 16-17. 2 illus., diagr.
Previous part in Volume 18 page
257.
London, Brighton & South Coast Ry. 17.
2-6-0 under construction at Brighton Works for Newhaven to Willow
Walk freight trains.
Ahrons, E.L. Great Western Ry. engines Nos. 69 to 76. 17-19. 2 illus.,
drawing (s. el.)
Standard gauge 2-2-2 designed by Gooch and constructed by Beyer Peacock
with 6ft 6in driving wheels, 15½ x 22in cylinders, 1111.82ft2
total heating surface and 13.6ft2 grate area. Used on Paddington
to Wolverhapton services once mixed gauge was available. Rebuilt
1872-5.
Oil locomotive for industrial railways. 19. illus.
Manufactured by Saunderson & Mills of Bedford with three-speed
gearbox.
A novel locomotive for the Argntine. 20. 2 illus.,
diagr.
Metre gauge 2-8-2 for Midland Railway of Buenos Ayres.
See also p. 94.
London & South Western Ry. electrification scheme. 21. map
Running shed renewals of piston heads. 21. 2 diagrs.
Stratfordians' Association. 22
Annual Dinner on 6 December 1912.
No. 246 (15 February 1913)
Issue missing from copy inspected
L. Wiener. The locomotives of the Rio Grande do Sul Railway, Brazil. 33
Ahrons, E.L. Great Western Ry. engines Nos. 69 to 76. 37-8.
Fig. 4: 2-2-2 No. 71 (rebuilt)
Fig. 5: 2-4-0 No. 69 (rebuilt) (from Index)
The locomotives of the Great Eastern Railway. 39-40.
5 figures
Fig. 249: 2-4-2T No. 790
Fig. 250: 2-4-2T No. 105
Fig. 251: 2-4-2T No. 61
Fig. 252: 2-4-2T No. 1085
Fig. 253: 2-4-2T No. 1300 (from Index)
North Eastern Railway: latest developments in the Locomotive, Carriage and Wagon Departments. 46-8.
No. 247 (15 March 1913)
Our Supplement: Great Central Railway superheated tank locomotive. 51 + folding
diagram (detailed sectionalised drawing)
Robinson 4-6-2T with 20 x 26in cylinders; 1649ft2 total
heating surface; 21ft2 grate area and 160 psi boiler pressure.
Latest into service Nos. 451-2 and 128-9.
Four-cylinder express locomotive, London & North
Western Ry. 51-2. illus.
No. 2222 Sir Gilbert Claughton designed by Bowen Cooke. Trial
run from Rugby to Crewe on Sunday 9 February with a load equivalent to 20.5
vehicles: 75¼ miles run in 82 minutes. The locomotive had four 16 x
20in cylinders; 6ft 9in coupled wheels; Walschaerts valve gear;
1818.4ft2 total heating surface; 30.5ft2 grate area,
Schmidt superheater and 175 psi boiler pressure. The crank setting
was described. Nine further locomotives were on order. See
also p. 72.
North Eastern Ry. 52. illus.
No. 1247 illustrated: Raven T2 class superheated 0-8-0 with 4ft 7¼in
coupled wheels; 20 x 26in cylinders; 23ft2 grate area and 175
psi boiler pressure. It was fitted with Ross pop safety valves.
Great Northern Ry. 52.
Ivatt 1301 class rebuilt with larger boilers: No. 1317 of T class
rebuilt as W class (boiler was similar to that fitted to No. 1321, but with
an extended smokebox. The class had 17½in x 26in cylinders and 6ft
7½in coupled wheels.
London & North Western Ry. 53.
Output from Crewe: five new superheated 0-8-0s: Nos. 326, 633, 1192,
2245 and 2421; four George the Fifth 4-4-0s: No. 82 Charles Dickens,
752 John Hick, 1138 William Froude and 2124 John Rennie
(and a further 20 were on order). Precursors Nos. 2062 Sunbeam
and 2164 Oberon had been fitted with superheaters. No. 1921 John
o' Gaunt (previously T.H. Ismay) had been converted to a simple
with 18½in cylinders and a large boiler. No. 1971 Euryalus (Alfred
the Great compound) had also been converted to a simple.
Obituary. 53
Richard Francis Trevithick joined LNWR at Crewe Works in 1867. Appointed
Locomotive Superintendent of the Rosaario Cordova Railway in Argentine in
1871; produced a report on the Caracas Railway in 1881-4; later CME Ceylon
Government Railways, and then joined Japan's Imperial Government Railways
in 1887 where he was responsible for first locomotive to be constructed in
Japan (at Kobe). Retired 1904.
Heavy narrow gauge locomotives for the Antofagasta (Chili) & Bolivia
Ry. 53-4. illus.
2ft 6in gauge 2-8-2 supplied by Hawthorn Leslie & Co to the
requirements of Consulting Engineers Livesey, Son & Henderson. They had
17 x 22in cylinders, 3ft 1¼in coupled wheels, 1618ft2 total
heating surface and 26.5ft2 grate area. They were equipped with
Hornish mechanical boiler cleaners, Coale muffled pop safety valves and the
Variable Blast Pipe Company's patent blast pipe.
Model of an old American passenger locomotive. 54. illus.
Wooden model 4-4-0 built in 1866 by F.W. Bleuvelt of New York.
L. Wiener. The locomotives of the Rio Grande do Sol Railway,
Brazil. 54. diagr.
Caxias Railway: 100 miles long. Fig. 24 shows a Decauville (WN 440)
0-4-2T with outside frames.
Four-coupled express engines, Midland and South Western Junction Ry. 55. illus.
Correspondence. 68-9.
The Centenary of the locomotive. John H. Anderson
Plea for celebration of Hedley's contribution to locomotive development.
Notes that horse wagon loads were called "dillies"; hence Puffing Billy and
Wylam Billy. Man called Scott oberved the locomotive start in 1813. Workmen
and their wives were conveyed to and from Lemington on trains behind the
locomotive en route to Newcastle by wherry
"The first railway in London". Charles H. Jordan.
69
Refers to book by Rosling Bennett on the London & Greenwich
Railway. Notes additional information contained in A.M.
Broadley and R.G. Bartelot's The three Dorset Captains at Trafalgar: Thomas
Masterman Hardy, Charles Bullen, Henry Digby (London, John Murray, 1906)
wherein it records that Sir Thomas Hardy of the Victory had become
Govenor of the Greenwich Hospital in 1836 and when the railway opened Lady
Hardy made up a party for a trial trip, and the journey both ways was effected
in twenty minutes. Sir Thomas Hardy declined to go at any price, saying it
was a needless rick to run and until his death four years later, could never
be pursuaded to enter a railway carriage".
No. 248 (15 April 1913)
Railway Notes. 71.
Great Eastern Ry. 71.
Illustration of No. 1506: one of series of ten 4-6-0 express engines,
of which Nos. 1505, 1506 and 1507 were in service, the first two being stationed
at Ipswich, and the last at Stratford. The splashers were different from
Nos. 1500 to 1504. necessitating a narrower number plate, the first departure
from the standard since 1882. The leading footstep was also slightly altered.
Another modification, not so apparent in the photograph, was the coupling
rods being placed in the same radial centre line as the cranks, and the balance
weights altered to suit, thus following the practice of the W. Stroudley
on the L.B. & S.C.R. A.J. Hill, Locomotive Superintendent.thanked for
particulars and photograph,
London, Brighton & South Coast Ry. 71.
The last order for 4-4-2 tanks, Nos. 82 to 91, had been completed,
and the ten engines were in service. Work was progressing on the first three
of the new 0-6-0 side tanks, E2 class. Nos. 365, 368, 370 and 390 0-4-4 tanks,
had been rebuilt with the new pattern boilers, extended smokeboxes, and standard
chimneys, and looked exceedingly smart. No. 183 (formerly
Eastbourne) had been rebuilt with a new boiler, Ramsbottom safety
valves, etc., similar to Nos. 184, etc. No. 209 (4-4-0 express) was being
rebuilt similarly. The four-coupled bogie express engine 317 (formerly
Gerald Loder) was fitted with a special feed water heater designed
by L. Billinton, and also has a Weir pump. No. 324 of the same class was
also being rebuilt
Great Central Ry. 71.
No. 424 of the Sir Sam Fay class was at work, and Nos. 425 and 426
were nearly complete at Gorton shops. The last engine of this series was
to have driving wheels 5ft. 7in. in diameter. In consequence of the two new
4-6-2 tanks taking the numbers 128 and 129, two of Sacre's 423 class
(described and illustrated recently) had been placed on the duplicate list.
Kitson & Co. had completed delivery of all the new 2-8-0 mineral engines,
which were stationed as follows 1183-1202, Mexboro' district; 1203-1211;
1241-1244, Grimsby and Irnmingham , 1212-1228, Annesley; 1229-1236 and 1248,
Staveley; 1237-1240, Retford; 1245-1247, Sheffield; 1249-1251, Gorton.
Superheaters were being fitted to Nos. 1021 and 1023 of the Sir Alexander
class. Two of the earlier 6ft. 6in. 4-4-0 express engines (562 and 707) had
been fitted with extended cabs and standard boilers.
Great Northern Ry. 71.
Four new 2-6-0 mixed traffic engines had been finished at Doncaster,
Nos. 1631 to 1634, which were exactly like No. 1630, but the leading pony
truck wheels being 3ft. 2in. diameter, instead of 3ft. 8in.
London & South Western Ry. 71
The second small 0-6-0 tank purchased from the L. B. & S. C. R.
some years ago, No. 734, had been rebuilt with a new boiler, etc.
Caledonian Ry.72
Nos. 903-907, Cardean class, and Nos. 49 and 50 had been fitted with
superheaters, and piston valves above the cylinders operated by rocking
shafts.
Northern Ry, of France.72.
A trial run was made with one of the Decapod engines on the 17 February
with a train of 32 40 ton bogie coal wagons (containing 1,280 tons ot coal)
the train weighing l,800 tons, without the engine and tender, left Lens at
20.30 and reached Paris at 04.30 next morning. Engine 2.741 which was formerly
of the 4-4-4 type with a water tube boiler has been transformed at La Chapelle
works into a 4-6-0, with Belpaire firebox and Schmidt superheater. The letters
and figures on this engine were made of copper, and fastened to the side
splashers.
Lancashire & Yorkshire Ry. 72.
Nos. 20, 243 and 1363 new standard superheater goods engines, with
Belpaire fireboxes. New features included the cab side sheets deepened and
small guides for the valve spindle crossheads. No. 20 replaced a Sharp, Stewart
bogie tank, No. 243 a Kitson 0-6-2 tank, and No. 1363 a 0-6-2 Kitson tank,
formerly No. 3, West Lancashire Ry. The 2-6·2 tank engines built in
1903 had been withdrawn from the Oldham, Royton, Shaw, Middleton and Stalybridge
services, and were used mainly for banking purposes in the East Lancashire
and other hilly districts. No. 392 (0-8-0) which was experimentally fitted
with a corrugated cylindrical firebox in 1901, had been rebuilt with the
new large boiler as fitted to the No. 9 class of engines.
Highland Ry. 72
Four 4-6-0 Castle class engines for this line have been built at the
Queen's Park Loco. Works of the North British Locomotive Co. They are practically
identical to others of the Castle class, with the exception that they had
a slightly extended smoke box and a deflector was fitted on the chimney.
They had the following names and numbers: No. 26 Brahan Castle; No.
27 Thurso Castle; No. 28 Cluny Castle; and No. 43 Dalcross
Castle.
Great Western Ry. 72
New engines of the 2-8-0 mineral tender class were Nos. 2850 to 2855,
inclusive. Four new engines of the Court class (two-cylinder 4-6-0 express)
had been completed at Swindon: Nos. 2951 Tawstock Court, 2952
Twineham Court, 2953 Titley Court, 2954 Tockenham Court.
A new engine shed was to be built at Ponsandane, near Penzance, to take the
place of the old shed at Penzance which was inconveniently situated near
the station.
London & North Western Ry. 72.
In the description of the new four-cylinder express
engine, Sir Gilbert Claughton, page 51, the stroke
of the cylinders was given as 20in. but this should have been 26-in. it failed
to draw attention to the side doors between engine and tender fitted to this
engine, an innovation on the L. & N. W. R. The engine is fitted with
Gresham & Craven's exhaust steam injectors,and two Wakefield lubricators.
New engines of the George the Fifth class are Nos. 89 John Mayall,
132 S.R. Graves, 1138 Henry Frowde (not William Froude
as given in the last issue), 1193 Edward Tootal, 2154 William
Siemens, 2168 Henry Maudslay, 2279 Henry Crosfield, and
2282 Richard Arkwright. No, 2168, had the Bosch lubricator fitted
on the left hand side of the engine. Two of 4£t. 6in. double-ended tanks
(2-4-2T) (Nos. 2279 and 2282) had been sold to the Wirral Railway. Of the
same type, Nos. 326, 1192 and 2245 have been broken up, and No. 2517 had
been altered for motor service. Other withdrawals include Nos. 633
Samson, and 752 Glowworm (6ft. 2-4-0 passenger engines): the
former was the first coupled passenger engine to be constructed at Crewe.
The latest 4ft. 6in. tank to be altered for motor service was No. 2521. No.
2166, Shooting Star, was the latest Precursor to be altered to a
superheater, and is fitted with piston valves. One of those previously altered,
No. 513 Precursor was fitted with slide valves, and retained its original
appearance, whilst the others resembled closely the George the Fifth class.
No. 1628 Foxhound, of the George the Fifth class, had been provided
with new large sand-boxes placed in front of the driving splashers, and was
also fitted (as an experiment) with a flange lubricator to one of the bogie
wheels.
Ghent Exhibition.. 72.
The Locomotive Magazine and Railway Carriage & Wagon
Review and also the Indian Railway Gazette would
be available for reference in the Reading Room of the British Section at
the Ghent Exhibition, Bound volumes of the two journals will be filed also.
The Exhibition opens on 20 April for a period of at least six months. We
understand that Beyer, Peacock & Co. are exhibiting a Garratt type
locomotive.
Mixed traffic engine, North Eastern Railway, with Stumpf cylinders.
73. illus., 2 diagrs.
Uniflow or as stated in text Unaflow type with Walschaerts valve gear,
produced unedr Raven's supervision.
0-12-0 rack and adhesion locomotive, Austrian State Railways. 75-6. illus.,
2 diagrs. (including sectioned elevation, side and front)
Abt system with gradients of 1 in 14 on Eisenerz to Vordenberg section;
locomotive designed by Karl Goldsdorf and built at Floridsdorf Locomotive
Works.
L. Wiener. The locomotives of the Rio Grande do Sol Railway, Brazil. 78-9. 2 illus.
Alfred R. Bennett. Charles Dickens and the railway.
81-3.
Considers Our Mutual Friend, Mugby Junction, and Dombey
and Son. Considers Dickens' confusion about the colour of signals and
tail lamps: green for danger rather than red. Also critical of the quantity
of fictional ashes thrown into the air. Nevertheless, considers that the
Dombey and his friend Major Bagstock probably used the London & North
Western Railway to travel to the Midlands and that Toodle was a driver or
fireman on the line from Euston. Letter of criticism from
Amateur on p. 113..
Express locomotives, Nord-Belge Ry. 84; 83. illus.
Four-cylinder compound 4-4-0 type.
North Eastern Railway: latest developments in the Locomotive,
Carriage and Wagon Departments. 84-7. 5 illus., 4 diagrs. (side &
end elevations and plans).
Third class seven compartment corridor third with single lavatory;
full brake van with gangway connections; and invalid and family saloons
Locomotive framing. 88-9. 4 diagrs.
Design of frames for locomotives with a leading bogie, such as the
4-4-0. Problem was to allow for bogie movement which could be achieved by
cutting away the frames at the front; setting the frames inwards, making
them in two pieces, or by cutting upwards above the bogie to allow for its
movement. All weakened the frames to some extent.
South Eastern & Chatham Ry. 89.
Cravens Ltd of Sheffield were supplying three additional Pullman cars
to be named Seville, Alicante and Leghorn. They were 59ft long
and were painted in lake livery lined with gold.
Railway carriage and wagon building. The machines of the saw mill. 90-2.
2 illus., 2 diagrs.
Handling sawdust and scrap: removal via a pneumatic system with fans,
trunking and hoppers. Notes on machinery and its lubrication.
Correspondence. 94.
The Centenary of the locomotive. E.A. Forward.
Correspondent, in letter in March Magazine, ignores the claims of
Blenkinsop, who undoubtedly constructed and worked the first practical and
commercially successful locomotives on the Middleton Colliery Railway, near
Leeds. He appears to have been working on the subject in 1811, the year of
his patent, and 1812, in August of which year his engines commenced running,
and they ran for about 30 years. To Matthew Murray must be given the credit
of actually constructing the engines, which were obviously based on Trevithick's
designs. The fact that Blenkinsop's engines worked on a rack does not alter
the fact that they are the first commercially successful locomotives, or
that the Middleton line was the first actual steam railway.
H.J. Slythe. 94.
Of Deposito Locomotoras, Realicó, Argentine Republic, points
out a slight error in the description of the engine on page 20 of January
issue. This engine was for the Ferro-Carril Provincial, better known as the
F.C. de la Plata a Meriadiano Quinto, a line under construction by the Government
in the Province of Buenos Ayres. The Buenos Ayres Midland (F.C.M.B.A.) was
quite distinct, being a line built by British capital.
Replies and Queries. 94.
Sir O.H.P. Scourfield. 94
Asked if any reader could give particulars of the GWR broad gauge
six-wheeled single engines, Queen, Prince, Folk, Peri, Sylph, and
Witch. Built in 1846 at Swindon, they came between the Ixion and Great
Britain classes. They had inside bearings to all wheels and 7ft. drivers,
except Witch (7ft. 6in driving wheels). They ran for most of their
time between Didcot and Birmingham, but of what they did between 1846 and
the opening of the Oxford and Birmingham line in 1852 he has never heard.
See Frank S. Hennell p. 113..
On page 236 of our last volume (November,
1912). 94
Old Northumberland colliery locomotive which we were informed came
off the LNWR, being of Crewe goods design. A reader, however, was doubtful
about this being No. 176 on the L. & N.W. as they do not seem to have
had such an engine with this number. This design of engine was also built
by which ran on the London & South Western Ry. a No. 176. Of course the
North Devon line was broad gauge until 1878 to Bideford, but it is possible
the engines were converted. The Creedy was sold by the LSWR in 1877.
See also letter from Richard H. Inness on p.
177.
The Institution of Locomotive Engineers. 94.
On 26 April 26 at Caxton Hall, Westminster, at 19.00
W.J. Bennett would read paper on Locomotive
boiler inspection and repairs. Lawford
H. Fry read British, Continental and American locomotive development.
The following took part in discussion, opened by Garratt and continued
by Clayton (Derby), Stanier (Swindon), Labean, Wardlaw and Cosgrave. The
second annual dinner of the Institution was held at the Holborn Restaurant
on Saturday, 5 April. The President, Henry Fowler, presided and was supported
by Vice-Presidents F.A. Field, A.R. Bennett and several members of the Council.
Among the guests were A.J. Hill (locomotive superintendent G.E. Ry.), Bonner
(deputy locomotive superintendent G.I.P. Ry.), F.H. Trevithick (late Egyptian
State Rys.), Harben, Archbutt, Cosgrave, F.A. Field, Tilling, etc. The usual
loyal toasts were proposed by the President, The Institution, proposed by
the President, to which C.A. Suffield responded; Our Guests, proposed by
Lawford H. Fry and replied to by A.J. Hill. Suffield proposed the health
of the President which was drunk to the accompaniment of musical honours.
No. 249 (15 May 1913)
The Royal visit to Crewe Works, L. & N. W. Ry.
95.. illus.
On Monday 21 April the King and queen joined the Royal Train at Euston.
Thie left at 11.30 hauled by Nos. 2663 George the Fifth and 2664
Queen Mary. This differs from account on p. 116.
Arrival was at 14.30 when their Majesties were welcomed by the Marquis
and Marchioness of Crewe and the Duke of Westminster and were received by
C.J. Bowen Cooke, the chief mechanical engineer, and the Mayor of Crewe,
F. Manning, who was a railway signalman. The locomotive No. 2222 Sir Gilbert
Claughton was on display.
New superheater locomotives, Great Northern Ry. of
Ireland. 96-7. illus., diagr. (side elevation)
Names p. 116
Baltic type tank locomotive, Midland Ry., London, Tilbury
& Southend Section. 97 + plate (facing page)
No. 2101 in Midland red livery
New express locomotive, Furness Ry. 98. illus.
Fitted Ross pop valves see p. 157.
W.J. Barker. The Centenary of Hedley's "Puffing Billy". 104-6. 2
illus.
Adhesion test with a manually powered vehicle took place in October
1812. A Patent for a locomotive was dated 13 April 1813. Puffing Billy was
constructed at Wylam under the supervision of Thomas Waters of Gateshead
with the assistance of Jonathan Foster, enginewright, and Timmy Hackworth,
foreman blacksmith. A trial took place in February 1813, but the boiler was
too small and a return flue boiler was built by Parker at the Tyne Iron Works
at Lemington. For a time the locomotive ran on eight wheels. There is a
description of the locomotive as housed in the Science Museum, South Kensington.
L. Wiener. The locomotives of the Rio Grande do Sul Railway, Brazil. 106-7. 2 illus.
The Armstrong oiler for locomotive axleboxes. 107. diagr.
Lubricating system
The last of the broad gauge. 107.
Holyhead Harbour railway converted to standard gauge.
London & South Western Ry. 107.
Ten two-cylinder 4-6-0 locomotives under construction at Eastleigh
with 21 x 28in cylinders: two to be satuated and four to be fitted with Schmidt
superheaters and four with Robinson superheaters.
Football Cup Tie specials. 107.
Final on 19 April played at Crystal Palace between Aston Villa and
Sunderland attracted 121,000 spectators. LNWR ran 44 special trains; GNR
39; GWR 30; MR 23 and GCR 21.
A pressure-balanced piston and valve ring. 108-9. 3 diagrs.
The locomotives of the Great Eastern Railway. 109-10. 2 diagrs.
North Eastern Railway: latest developments of the Locomotive, Carriage and
Wagon Department's wagon stock. 110-11. 2 diagrs.
Previous part p. 87. 20 ton 4-wheel plate wagon with plate carried
at an angle to fit loading gauge. Fitted with rubber drawgear and buffer
springs.
Double-ended slip composite brake, London & North Western Ry.
112. illus., diagr., plan
57ft long with five lavatory compartments, electric lighting and steam
heating.
Steel panelling for railway carriages. 113.
Charcoal finish steel railway carriage panels and locomotive boiler
clothing made by John Lysaght, Ltd., at the Orb Ironworks, Newport, Mon.
Now that the leading railways are introducing all-steel coaches and the use
of steel panelling for the outsides of carriages has become general, Lysaght
have studied the requirements very thoroughly and are producing a panel with
a bright, smooth and dense surface which is also economical for use. These
panels are supplied dead flat and cut exact to the required dimensions, ready
to put in position on the coach, and they require practically no filling
up or rubbing down. The firm also still supply their ordinary finish steel
panels which are used in large quantities on Indian and Foreign railways,
where the cheap native labour keeps down the paint shop charges. These panels
have not the high polish which is given to the charcoal panels. For covered
goods wagons a third class of steel sheering is manufactured in a special
plant. Sheets for the top ends of wagon bodies (where the roof curve is a
true radius) are machined in one operation, mechanically accurate. These
sheets are flattened hydraulically and are a great improvement on the ordinary
hammered-sheets) where every hammer mark shows unless filling-up is resorted
to.
Reviews. 113.
Modern Railway Working.
Volume III of this serial, published by Gresham Publishing Co. included
articles on railway bridges, the design and construction of railway steelwork,
tunnel construction with shields and compressed air, reinforced concrete
in railway construction and permanent way. The text is fully illustrated
by detailed drawings, with plates of the Findhorn Viaduct, King Edward VII.
Bridge at Newcastle, Great Western Bridge at Worcester, Greathead shields
used on the Central London Ry., Viaduct over the Suir at Waterford, and a
reinforced concrete jetty at Newport.
Railway Wonders of the World. 113
Cassell & Co., Ltd., were issuing a new serial entitled Railway
Wonders of the World, to be completed in 24 fortnightly parts; edited
by F.A. Talbot, who has simplified all technicalities, and in a popular manner
tells this story of the great railway undertakings of the world. Subjects
include: Across the Andes by Aerial Railway, Crack Trains of the World,
Railroading the Glaciers, The Uganda Railway, The Wonders of Signalling,
Spending Millions to Save Minutes, The Story of the C.P.R., Monster Engines,
Electric Giants. The book is illustrated with, 24 coloured plates and a
magnificent series of photographs.
Correspondence. 113.
[Charles Dickens and the Railway]. Amateur
The part referring to Turner's Rain, Steam and Speed is especially
delightful, and recalls doubtless to many, the amused astonishment, felt
on gazing at the Master's reckless endeavour to portray things with which
he was little conversant, and with regard to whose details he showed such
lofty artistic indifference. A similar result is to be seen in his Fighting
Temeraire, with its well known tug of the inordinate funnel. fay I dare,
however, as an amateur admirer of Turner, to call attention to what appears
to be a slight slip in Mr. Bennett's remarks, when he says. "when treating
of railways, our beloved Dickens' pen is little better than Turner's brush.
The word picture and the water colour are much on a par, that is to say,
misty." May I point out that Mr. Bennett, though so successful in detecting
the mechanical absurdities of Turner, is, on his own part, a little misty
when he comes to deal with the artistic side of the question. The picture'
referred to is an oil painting, and not a water colour. One sometimes feels
that a review of the technical and scientific slips made by writers and painters
would make instructive, and at the same time, amusing reading.
Queen class G.W.R. broad gauge engines. Frank
S. Hennell. 113.
In answer to Sir O. H. P. Scourfield, when I was at Swindon from 1862
to 1864 I always understood that these six engines were built there for the
Didcot and Birmingham line, but if that section was not opened until 1852,
as stated, I suppose that prior to that date they worked on the main line,
probably between Paddington and Swindon. These engines were fully described
in the history of the G.W.R. Broad Gauge Locomotives, published in the
Locomotive Magazine several years ago.
No. 250 (14 June 1913)
Railway notes. 115.
Great Indian Peninsula Ry. 115. illus.
The Bombay-Punjab Mail Express was double-headed over the lines ot
the G.I.P.R.: illustration shows it with two 4-6-0 superheater express
locomotives built by the Vulcan Foundry, Ltd., which were
described in the" Locomotive Magazine " for January (page 3). The train
was popular for homeward bound Anglo-Indians sailing from Bombay, and in
the season often consisted of ten heavy cars weighing as in approximately
450 tons. Its long run down the Indian Peninsula compared favourably with
European train times for similar distances.
Glasgow & South Western Ry. 115
First of fifteen large 0-6-0 type delivered from Queen's Park Works
of North British Locomotive Co. These had 5ft coupled wheels and 5ft 3in
diameter boilers pitched 8ft. 6in. above rail level. They had Stephenson
link motion and 10 inch piston valves. The inside cylinders were 19½in.
x 20in. The smokebox was fitted with Dugald Drummond's steam drier, which
was really an extension of the flue tubes in the form of two headers, through
which the steam passed to the steam pipe. Steam reversing gear was fitted,
and duplex pumps, placed under the footplate, between the driving and trailing
wheels, took the place of injectors. Minor details included the Drummond
style of cab, with supporting pillars, and safety valves similar to those
on the Castle class engines on the Highland Ry. The engines were painted
the Highland Ry. green, but are lined according to G&SWR practice. Running
numbers: 279; 292-305; WN 20113-20127.
Lancashire & Yorkshire Ry. 115-16.
A series of eight-coupled superheater goods engines was being completed.
They had extended smokeboxes, and Wakefield mechanical lubricators. They
bore numbers commencing 1546, the Horwich works' numbers commencing at 1174.
Five were running. The twenty six-coupled superheater goods, built between
March and August 1912, were: Nos. 657, 691, 791, 883, 907, 917, 918, 1363,
1364, 1366, 209, 234, 239, 300, 20, 219, 233, 237, 243, 920 (Horwich WN.
1152-1171 in the order given). Following these came two rail motors, Nos.
17 and 18 (Horwich WN. 1172-3).
South Eastern & Chatham Ry. 116
Five 0-6-4 tank engines under construction at Ashford works for London
suburban services. These engines are an enlargement of the 0-4-4 tank engines
already in service. The cylinders were 19½in. by 26in. stroke, and fitted
with 8in. dia. piston valves, worked by a rocking shaft off the link motion.
The coupled wheels were 5ft. 6in. diameter, and the bogie wheels 3ft. 7in.
diameter. They would be fitted with a Schmidt superheater of 21 elements,
a reduced boiler pressure of 160 psi being adopted. Steam reversing gear
was fitted and Wakefield's mechanical lubricator. The weight in working order
is to be about 70 tons. The water capacity is 2,000 gallons, and the coal
carried 2½ tons. A Belpaire firebox is fitted.. See
also pp. 250 and 272.
London & North Western Ry. 116
A further five passenger engines of the George the Fifth class
(superheater) were anticipated: Nos. 404 Eclipse, 1481 Typhon,
2197 Planet, 2242 Meteor, 2279 Henry Crosfield, and
2428 Lord Stalbridge. The latter name was intended for the first of
the nine four-cylinder passenger engines, two of which had been completed
but not painted. They are named respectively No. 1161 Sir Robert
Turnbull and 1191 Sir Frank Ree. All the five Precursors which
recently were fitted with superheaters have new coupled wheels with large
bosses, and No. 804 Amphion of the same type, but not superheated,
had similar wheels. No. 785 had been altered for motor service. No. 1138
named William Froude, as given in our March issue. Two Webb four-cylinder
compound passenger engines had been converted to simples: No. 1921 John
O'Gaunt (formerly T. H. Ismay) and No. 1971 Euryalus, the
former of the Jubilee class and the latter of the Alfred the Great class.
. Oh. the occasion of the Royal visit to Crewe works on April 2 the Royal
train was drawn by No. 5000 Coronation assisted by No. 2663 George
the Fifth, both 4-4-0 superheater class, while No. 1213 The Queen
acted as pilot engine: this differs from account given on p.
95. The Queen is one of the 6ft. 6in. Jumbo type (2-4-0). The
same engines performed similar duties on the return journey.
[L. & N.W.R. locomotives]. 116
C. Williams, 15, Peel Street, Crewe, had published a supplementary
list of L. & N.W.R. locomotives to that dated 1912.
Great Western Ry. 116.
New 4-6-0 four-cylinder express engines of the King class were 4041
Prince ot Wales, 4042 Prince Albert, 4043 Prince Henry
and 4044 Prince George. The latest 2-6-2 tank engines were Nos. 4535
to 4538. No. 3043 Hercules, 7ft. 8in. single wheeler, had the new
top feed arrangement just in front of the large steam dome, and some of the
goods engines are similarly fitted.
Buenos Ayres Midland Ry. 116.
Five 2-6-4 tank engines had been ordered from Hunslet Engine Co.,
of Leeds. Engines to be fitted with Robinson superheaters and have cylinders
17in. by 24in.
Great Northern Ry. (Ireland). 116.
Five new four-coupled bogie express engines, one illustrated
on page 96 of our last issue, are named after Irish mountains as follows:
No. 170 Errigal, 171 Slieve Gullion, 172 Slieve Donard,
173 Galtee-more, and 174 Carrantuohill.
Alexandra Docks & Newport Ry. 116.
One of the six-coupled tank engines with outside cylinders, formerly
owned by the Severn & Wye Ry., named Will Scarlett, and numbered
on the GWR 1356, had been purchased by the A.D. & N. Ry. and numbered
32. It has 4-ft. wheels and cylinders 16in. by 24in. They had also purchased
No. 993 G.W.R. 0-6-0ST saddle tank, and this was numbered 33.
[Harrington and Lowca Light Railway Order]. 116
Board of Trade had confirmed the Harrington and Lowca Light Railway
Order, 1913, made by the Light Railway Commissioners, authorising the
acquisition, reconstruction and working for passenger traffic as a light
railway under the Light Railways Act, 1896, of the existing mineral railway
from the Harrington Colleries at Lowca to Barrington, Cumberland.
Our supplement: four coupled passenger engine. Manchester, Sheffield &
Lincolnshire Ry. 127 + col. plate fp. 2 illus.
F. Moore oil painting of Sacré 2-4-0 No. 363. Two black &
white photographs show 2-4-0 Nos. 319 and 147. The locomotive as depicted
in the plate had 16½ by 24in. cylinders, 6ft diameter coupled wheels
and was built in 1875. The wheelbase was identical to that of the 311
class.
North Eastern Ry. 117.
R1 4-4-0 type were being fitted with Robinson superheaters. G1 4-4-0
constructed in 1888 were also being fitted with superheaters and extended
smokeboxes.
Baltic type tank locomotive, Belgian State Rys. 118. diagr. (s. el.)
Superheated four-cylinder 4-6-4T with ability to carry 6 tons of coal.
Approximate cylinder dimensions: 16½ by 25¼in. 1572ft2
total heating surface; 30.57ft2 grate area and 170 psi boiler
pressure.
Locomotives at the Ghent Exhibition. 118-19.
Caledonian Ry. 119.
2-6-0 Nos. 34-8 in service.
The Baldwin geared locomotive. 119.
Twin bogie locomotive for logging or plantations. 3ft diameter bogie
wheels. 14 by 16in. cylinders with Hackworth valve gear. Drive through shafts,
universal couplings and bevel gearing. 887ft2 total heating surface.
Gear ratio 2.48. Lawson H. Fry supplied information.
Metre gauge express engine, B. B. & C. I. R., Rajputana Malwa Ry.
120. illus.
Inside cylinder 4-4-0 built in the Ajmer shops of the Bombay, Baroda
& Central India Railway under the direction of W.S. Fraser, locomotive
superintendent. Fitted with Joy valve gear and Belpaire firebox.
Mallet type locomotive, Kassa Oderberg Rly, Austro-Hungary. 120-1.
illus.
0-6-6-0 four-cylinder compound for working through the Jublunka Pass
in the Carpathian Mountains and fitted with the Le Chatelier brake.
Tank locomotive, Dowlais Iron and Steel Works. 121.
illus.
Inside-cylinder 0-4-0s with Belpaire boilers built at the Guest, Keen
& Nettleford's Dowlais Works under the direction of George Robson, who
was in charge of the locomotive stock. No. 40 King George V and No.
42 Queen Mary were named by their Majesties when they visited the
Works on 27 June 1912.
Prairie type express locomotive, Italian State Rys. 122. illus.
Ernest Breda Co., Milan 2-6-2 with Zara-Bissel leading truck and Schmidt
superheaters.
Testing and repairing regulators. 122-4. 4 diagrs.
Leaking or blowing through.
Superheater goods locomotives, Great Northern Railway
(Ireland). 124-5. illus., diagram (side elevation)
Five Beyer Peacock 0-6-0 with 5ft 1in coupled wheels, 19 x 26in cylinders,
1354ft2 total heating surface including 250ft2 superheater
(Schmidt type), 29.9ft2 grate area and 165 psi boiler pressure.
Charles Clifford design.
Great Eastern Railway Norfolk Broads. 125-6. illus.
Photograph of Claud Hamilton type 4-4-0 in works grey taken at Colchester
with the Norfolk Coast Express. Report of 23 May 1913 press outing to Norfolk
Broads at Wroxham and afterwards dinner at Hotel de Paris, Cromer.
Many senior officials present including W.H. Hyde, general manager, F.G.
Randall, superintendent of the line, C. Busk continental manager (presumably
unaware that a century later it was quicker to get to Paris from London than
to Cromer!), C. May goods manager and A.J. Hill locomotive
superintendent.
E.L. Ahrons. The utilization of waste heat in locomotives — Trevithick's system. 126-9. 4 illus.
Obituary. 129-30.
George Macallan. 129-30. illus. (port)
Material used for biographical
entry
James Walker. 130
Founder of firm and Lion Works which made packings.
Indian Railway Gazette. 130. illus.
Office in Calcutta.
Wallace Bentley. Modern railway shop machine tools. 131-48. many
illus.
Material missing from copy indexed
The Pentewan Ry. 149-50. 3 illus.
2ft 6in gauge railway transported china clay from St. Austell to Pentewan
Harbour, a distance of about 4 miles. It was incorporated on 7 August 1874
and opned in 1886. It was owned by the Trrewithan Estate. Two of the locomotives
were unusual in having tenders: these were built by Manning Wardle and were
0-6-0: they were WN 461/1873 Pentewan which had 20in coupled wheels and 7
x 12in outside cylinders. Trewithan (WN 994/1886) was similar but with slightly
larger (7½in diameter) cylinders. Canopus was another Manning Wardle
product (WN 1547/1901): it was an 0-6-2ST with outside frames and outsid
cylinders (7½ x 12in) and 20in coupled wheels. The fourth locomotive
Pioneer was an ex-British War Office 2-6-2T which had worked at Chattenden
Barracks and as delivered burnt liquid fuel using the Holden system. This
Yorkshire Engine Company WN 757/1893 was fitted with a Belpaire firrebox,
2ft 6in coupled wheels, 6 x 14in cylinders, 4.7ft2 grate area
and 205ft2 total heating surface
L. Wiener. The locomotives of the Rio Grande do Sul
Railway, Brazil. 150-1. 2 illus., diagr.
A total of 67 locomotives were supplied by Borsig in 1906: 4-4-0 and
2-6-0 designss (both illustrated) and a 2-8-0.
Locomotive proportions. 151-2. table
Table based upon D.K. Clark's train resistance data shows potential
haulage capacity on gradients between 1 in 100 and 1 in 10.
Machine for stripping spring buckles. 152-3. illus.
Supplied Judson-Jackson Co. ltd.
North Eastern Railway: latest developments of the Locomotive, Carriage
and Wagon Department's wagon stock. 153-7. 5 illus., 4 diagrs.(s. &
f/r els.)
Shows photograph of Stockton & Darlington Railway 6 ton chaldron
wagon to contrast with 12 and 10¼ ton mineral wagons and 10¼ and
8 ton coke wagons (in the case of the larger capacity wagon described as
"Cumberland coke").
Compressed cork pulleys.157.
Practically the whole of the Corporation and electricity works throughout
Lancashire and Yorkshire have adopted the cork pulleys manufactured by-the
Patent Cork Pulley Co., Ltd., of Horton Street, Halifax. By their use 20
to 30 per cent. in the driving power is saved, and the strain on the shafting
is minimised by the perfect grip of the belting. The co-efficient of friction
of cork is twice that of iron, so that narrower belts may be used, and the
power may be transmitted with less tension. Cone clutches of compressed cork
require considerably less pressure to keep in action.
Messrs R.L. Ross & Co., Ltd., of Stockport.
157.,
Inform us that the two new express engines for the Furness Ry.,
illustrated on page 98 of our last issue, are fitted
with the Ross Muffled Pop Safety Valve.
Decorative wood panels for railway carriages, etc. 157.
The General Seating Co., Ltd., of 13, City Road, London, were introducing
a new feature in decorative wood panels for the interiors of railway carriages,
dining cars, steamship saloons, yachts, etc hotel dining halls, lounges,
or wherever high-class panel work was used. Any particular view or subject
can be reproduced from suitable existing negatives, or special negatives
can be arranged for the purpose. By the method employed in making these panels
an absolutely perfect and permanent artistic photographic reproduction direct
on the wood is obtained, and by this special process the range of pigments
available can be adapted to produce various highly attractive colour effects.
Ordinarily finished, these panels have a rich olf-matt surface, but by French
polishing a highly glazed finish can be obtained.
T. Rowlands & Co., Ltd , 157
Of Palm Tree Works, Stainforth Road, Sheffield, inform us that the
Titanium Alloy Manufacturing Co., Niagara Falls, N.Y., which they have
represented in Great Britain for some time, has now appointed them European
Agents for their products.
Reviews. 157.
Calculations on the entropy temperature chart. W.J. Crawford,
Chas. Griffin & Co. 157
The meaning and significance of the term entropy are somewhat difficult
to understand at first, but Crawford's little book puts the explanation in
a simple form and teaches the student how to make use of the entropy-temperature
chart, even if he is not an expert in thermo-dynamics. Examples are given
for elementary students, as well as for more advanced, to enable them to
work out problems for themselves by means of the chart. and to obtain numerical
results.
British locomotives in 1912. J.F. Gairns. Brussels: M. Weissenbruch
This little brochure of 23 pages an annual production
is reprinted from the Bulletin of the International Railway Congress Association.
The first part deals with the new locomotive types that appeared on British
railways during 1912, and the second with the work performed by various classes
in a series of runs undertaken by the author. It is illustrated by nine excellent
photographic reproductions of locomotives, and an appendix contains the leading
dimensions.
Modern railway working. John Macaulay and Cyril Hall. Vol.
IV. London: Gresham Publishing Co.
The subjects dealt with in this volume fall under the following headings:
The completion of Section Il., devoted to the design, construction and
maintenance of railway works. In Section Ill, entitled Railway Mechanical
and Electrical Engineering, the subdivisions of the portion on locomotive
work are as under: (i.) Modern locomotive design; (ii.) Modern locomotive
types; (iii) Tank engines; (iv.) Goods engines, and (v.) Rail motor cars.
Chapters on Locomotive Workshop Practice and Equipment comprise (i.) The
arrangement of works; (ii.) The parttern shop; (iii) Iron foundry; (iv.)
The manufacture of steel castings; (v.) Brass foundry; (vi.) Boiler shop;
(vii.) Smithy-forging and springs; (viii.) Machine shop; (ix.) Wheel and
frame shop, and (x.) the erecting shop. Ottley 3738 (basic entry)
Great Central Ry. 157
Published an elaborate book of 237 pages, giving in an interesting
manner particulars of its facilities and arrangements for dealing with goods
or merchandise by railway. It is entitled Per Rail, and will be forwarded
to traders on application to the GCR. Publicity Department, 2 I 6, Marylebone
Road, N.W. The two-coloured maps of the colliery and industrial districts,
and of the GCR are effective. Ottley 5771..
No. 251 (15 July 1913)
Four-coupled superheater express engine, North Staffordshire Ry. 159.
illus.
For working the express train which ran during the summer months from
1 June, from Derby and Burton to Llandudno, via Crewe, the North Staffordshire
Ry. were using the handsomely proportioned engine illustrated (No. 38
illustrated). This engine had been in service for some months, and was
constructed at the Stoke Works, to the designs of J.H. Adams, locomotive
superintendent. It had 20 x 26in cylinders, with piston valves 8in. diameter.
The driving wheels were 6ft. diameter. The Belpaire boiler carried a working
pressure of 160 psi, the total heating surface was 1,281 ft2 and
grate area 21 ft2: Schmidt superheater fitted,
Great Central Ry. 159.
The last four 4-6-0 Sir Sam Fay class had been named: Nos. 424 City
of Lincoln, 425 City of Manchester, 426 City of Chester,
and 427 City of London. Unlike 423, which was painted the standard
passenger colour green, these four were painted black. Nos. 424 and 426 were
at Grimsby, and worked alternately to Manchester and to Nottingham. No. 1021,
4-4-0, had been rebuilt with a Robinson superheater, and was named Queen
Mary. No. 876, of the 852-881 class, had been rebuilt recently with the
addition of a superheater. Together with 857, 859 and 869, it was stationed
at Lincoln. All four had the Westinghouse brake for working through trains
coming from the Great Eastern Ry.
North Eastern Ry. 159-60.
Schmidt superheaters were being fitted to ten new 0-8-0 engines, class
T2, and 20 large tank engines. The following engines were also being converted
to superheaters with the Schmidt apparatus; 7 of class R1, 4-4-0, 10 class
R, 4-4-0, 7 class S, 4-6-0, 3 class S1, 4-6-0, 9 class Q, 4-4-0, and 5 class
F1, 4-4-0: total 71 engines being fitted.
French State Rys. 160
The boat trains between Paris and Dieppe and vice versa routed via
Argenteuil, Pontoise, Gisors and Serqueux. The time taken by day service
from London to Paris was 8 h. 3 m., a reduction ot 54 minutes on the former
timing. Anticipated that when new track on the Pontoise line has settled
down, the 168 km. between Paris and Dieppe would be covered in two hours.
All the express trains between Paris and Brest via Rennes had been accelerated.
The single track line between Segre and Nantes had been converted to double
line, so that the Paris and Nantes service is to be accelerated.
On the 3 June when M. Poincaré left Paris for Cherbourg on his visit
to London, the train was hauled by the Pacific type locomotive, 231-019.
The train left Paris, St. Lazare, at 11.00, and arrived at Cherbourg at 17.16.
The train was composed of three fine saloons ot the Presisident's train and
a dining car and two saloons of the International Sleeping Car Co. From
Portsmouth to London the President's train was hauled by the L.B. & S.C.R.
Atlantic type locomotive No. 39, named La France specially for the
occasion.
Shropshire & Montgomeryshire Ry. 160.
illus.
Due to the able management of this line by H.F. Stephens, it had become
quite a remunerative undertaking. The stone traffic on the Criggion branch
was increasing fast, but the passenger traffic was still not very extensive.
To provide good facilities on this branch, and at the same time do this as
economically as possible, Stephens had the diminutive inspection engine
Gazelle rebuilt as a 0-4-2 type, and was using this as a rail motor
with an old L.C.C. tramcar, slightly altered and provided with side buffers,
as the passenger vehicle. Locomotive illustrated as modified with all wheels
the same diameter, 2ft. 3in., the leading and driving being coupled. The
leading and trailing wheels had wood centres but the middle pair were solid
cast iron. Illustrated on page 106 of our issue
for 15 May 1911, in its original state as a single driver. A cab
has also been added as protection for the driver.
Earl's Court Exhibition. 160
At the Imperial Services Exhibition, one of the attractions was a
Military Red Cross train consisting of.a standard London & South Western
Ry. bogie ambulance coach, two four-wheeled armoured trucks, one rigged up
with a Maxim and the other with a Hotchkiss gun, and a searchlight, and in
between these two trucks is L. & S. W. four-wheeled tank locornotive
No. 82. The engine had iron plates all round, and was buried under several
dozen sand bags, in fact all that is visible of the engine is the buffer
beam and part ofthe wheels. No. 82 is one of the three Southampton Dock shunters
(Nos. 82, 83 and 84) built in 1908 with driving wheels 3ft. 0in.
diameter.
London & North Western Ry. 160
A further five 4-cylinder passenger engines (Claughton class) had
been completed at Crewe: Nos. 21 Duke of Sutherland; 103 Holland
Hibbert; 650 Lord Rathmore; 1319 Sir Frederick Harrison
and 1327 Alfred F'letcher. The Sir Gilbert Claughton had been
provided with a new type of safety valve, having double springs with two
levers. Subsequent engines of this class would be so fitted. No. 1161 Sir
Robert Turnbull had been running between Crewe and Manchester with local
trains. No. 107 would be the first of a new series of superheated goods then
being built
Our coloured supplement. 161.
Actual Supplement missing from copy inspected
L. & N. W. express locomotive "Sir Gilbert Claughton. (includes drawing
side elevation)
Midland Railway express locomotive No. 1400
Texts give brief "biographies" of locomotives concerned.
Railway strike in India. 162
Unrest had been experienced among the staff of the Madras & Southern
Mahratta Railway, and this asserted itself in a partial strike in May, Madras,
Bangalore and junctions stations being chiefly affected. The cause of the
trouble was not very apparent at the outset, but certain grievances were
soon formulated and these were generously met by the Agent, concessions being
granted nearly all sections of the staff. These ,however, did not include
recognition of the Amalgamated Society of Railway Servants, an unimportant
organisation, having its headquarters in Bombay, and which entered the arena
after the strike had commenced. The General Secretary finding that his attempts
on the M.S.M.R. met with no success attempted to coerce the administration
of that Ry. into recognition by ordering a general strike on all railways
in India and Burma. Manv threats were made and different times given for
the event; finally an order went forth for a stoppage at 12 noon on Sunday,
June and. The result was a partial strike among the Society's adherents on
the G.I.P. system and a few followers on the B. B. & C. I. R. and other
southern railwaysthose of the north were unaffected.
Naturally considerable dislocation of traffic followed, and for a time it
seemed uncertain as to what would happen. After a few hours, however, it
was clear that only a few men had really decided to go "on strike." Several
of the important mail trains were despatched whilst others arrived late,
and by changing over engines, drivers, guards, etc., the services were
maintained.
After 2 or 3 days of uncertainty, during which time the Boards of Directors
were threatened, the Railway Board, the Viceroy, and Government invoked for
interference (the Government did interfere by putting soldiers on the stations
and deputing military guards for the trains), the majority of the strikers
saw their misguided action received no sympathy and that they were quite
powerless to paralyse business as they apparently imagined they could, they
expressed anxiety to return to work, many, however, losing their records
of continuous service, which would have secured them substantial bonuses
on retirement. Since the strike mutual recriminations have been the order
of the day among the members of the "Union," and it would seem that the A.
S. of R. S. of India has brought about its own downfall by its ill conceived
action.
Italian State Rys. 162.
Since the 1 July, 1905, when the State Administration commenced to
work the Italian Rys., until 1913, 2,752 locomotives had been added to stock.
Of these 665 had been imported from other countries, and 2,077 had been built
in Italy, the Ernest Breda Co., of Milan, being responsible for 725, and
the five other Italian locomotive building firms accounting for the remaining
1,352. The 665 locomotives purchased abroad were from the following:
Baldwin Loco. Works | 20 |
Saxon Loco. Works, Chemnitz | 12 |
Societe L'Energie, Belgium | 12 |
Esslingen Loco. Works, Germany | 19 |
Société Alsacienne, Grafenstaden | 9 |
Hanover Loco. Works, Linden | 6 |
Henschel & Son, Cassel | 218 |
T.A. Maffei, Munich | 141 |
Midland Ry., Derby | 50 |
Schwartzkopff, Berlin | 121 |
Sigl & Co | 36 |
Hungarian State Rys. | 9 |
Swiss Loco. Works, Winterthur | 14 |
Total | 665 |
The total of 2,742 locomotives includes 875 for service on express trains as follows :-
Group 600 | 2-6-0 type | 226 locos |
Group 625 | 2-6-0 type | 108 locos |
Group 630 | 2-6-0 type | 100 locos |
Group 640 | 2-6-0 type | 169 locos |
Group 666 | 4-6-0 type | 10 locos |
Group 670 | 4-6-0 type | 12 locos |
Group 680 | 2-6-2 type | 151 locos |
Group 685 | 2-6-2 type | 66 locos |
Group 690 | 4-6-2 type | 33 locos |
Total " The 820 locomotives of groups 600, 625, 630, 640, 680 and 685 were fitted with the Zara-Bissel truck, the leading truck axle in conjunction with the first coupled axle forming a bogie.
Great Northern Railway. 162.
Further 2-6-0 engines of the 1630 class, numbered up to 1639, were
running, and Nos, 546 to 555 were latest superheated 0-6-0 engines of the
521 class. Commencing at 541 these engines differed in a few details from
Nos. 521 to 540, which were described and illustrated
on page 237, volume 17. The leading sandboxes were now above the footplate,
and the plain chimney was replaced by one similar to that on the 251 class.
Nos. 71 to 80, were similar, except that they had larger coupled wheels.
No. 1072 was latest engine of the 400 class to be rebuilt with large boiler
and extended smokebox, No. 1532, 4-4-2 side tank, had been fitted with a
modified form of condenser pipes. The pipes were turned downward from the
smokebox, instead of upward, and followed the line of footplate, entering
the tanks at the bottom instead of at the top, as formerly.
2-10-0 locomotive, Northern Railway of France. 163-5. illus., 5 diagrs. (including side elevation)
Indian railway accident. 165. illus.
On 30 April 1913 at Borgaon on Bhusaval to Nagpur section. Collision
between a passenger train and a freight train in which 32 were killed and
20 injured. Took place on single track where Neale's ball instruments were
used to control traffic. Accident due to human error.
Sheffield Corporation. 165.
Brush Electrical Engineering to supply 25 double deck tramcars with
top covers
Hornblocks or axlebox guides. 166-7. 2 diagrs.
Design criteria. Strengthening of frames around horns. Fit of axlebox
guides. Wedge adjustments.
The Torrington and Marland Light Ry. 167-9. 6
illus.
3ft gauge. Engineer was Fell. There
were five locomotives:
No. 1 Mary: 0-6-0ST: Black Hawthorn WN 576/1880: 1ft 8in coupled wheels,
10 x 12in cylinders and 120 psi boiler pressure
No. 2 Marland: 0-6-0T: Bagnall: 1ft 9in coupled wheels
No. 3 Peter: 0-4-0T: Stephen Lewin
Three Fletcher Jennings saddle tank engines built in 1873 to work on the
breakwater at St. Helier in Jersey were acquired in 1908 and from these one
locomotive was assembled, but this was found to be too heavy and the saddle
tank was mounted on a wagon (tender) and the locomotive ran as an 0-4-0.
In 1901 No. 11 was acquired from Avonside: WN 1428. A vertical boiler locomotive
with steeply inclined cylinders which had been acquired from South Shields
was scrapped in about 1908.
Superheater metre-gauge passenger locomotive South Indian
Railway. 170. illus.
R. & W. Hawthorn, Leslie & Co. 4-6-0 with Belpaire firebox
built under supervision of Robert White.
L. Wiener. The locomotives of the Rio Grande do Sul Railway, Brazil. 171-2. 2 illus.
E.L. Ahrons. The utilization of waste heat in locomotives — Trevithick's system. 172-5. illus., 2 diagrs., 2 tables
Great Northern Ry. 175.
New railway connecting Kirkstead on the "loop" line with Little Steeping
on the East Lincolnshire line opened for goods traffic on 1 June and passenger
traffic on 1 July 1913. Line was 15 miles long from Coningsby Junction to
Bellwater Junction and there were five intermediate stations: Coningsby,
Tumby Woodside, New Bolingbroke, Stickney and Midville. Trains from Manchester,
etc to Skegness could avoid Boston and save about 45 minutes
The "Menno" compressed air grease cup. 176. diagr.
Correspondence. 177.
The Centenary of the locomotive. William E.S.
Brown
Citing the British Alamanac for 1837 the writer argues that
althouth Trevithick invented the locomotive this was not intended to operate
with smooth wheels on rails as Trevithick advocated fitting projections
to the rims or tyres of his locomotives to assist adhesion. Locomotives with
smooth wheels had to await Blackett at Wylam Colliery in 1813. In the interim
Blenkinsop had initiated commercial steam traction with a rack system.
[Old "Crewe" type goods at colliery]. Richard H. Inness
Built at Canada Works ion 1857 WN 53 and ran on Shrewsbury & Hereford
Railway until absorbed by LNWR. Rebuilt in 1869 as LNWR No. 1041. Sold to
1874 to Horsley of Newcastle-on-Tyne who in turn sold it to John Bowes &
Partners owners of colliery. Locomotive rebuilt again in 1898 by Chapman
& Furneaux. Scapped in October 1905.
No. 252 (15 August 1913)
The Royal Train in Lancashire. 179-80. illus.
The transport for much of an extensive tour of Lancashire was provided
by motor cars travelling by road, but the Lancashire & Yorkshire Railway
erected a special halt at Rainford to assist with the Royal party joining
and leaving the Royal Train. On Tuesday 8 July the Royal party entrained
at Bristol Talbot Road which was left at 17.45: Rainford Halt was reached
at 18.57. On 9 July the Royal Train, powered by LYR 4-6-0 locomotives Nos.
1514 and 1525 left Rainford Halt for Colne. Later on the same day the
Royal Train was waiting at Rochdale to transport the King and Queen to Rainford:
it left at 17.50 and arrived at 18.39. On 10 July the train provided transport
between Bolton Trinity Street and Rainford. On 12 July the train was handled
by the LNWR running from Huyton to Ashton Charlestown and from West Leigh
to Huyton.
Great Central Ry. 180. illus.
Mixed traffic 4-6-0 with inside cylinders (21½ x 26in) and Robinson
superheater: No. 4 Glenalmond illustrated. Intended for express freight,
including fish traffic and excursion trains.
Great Eastern Ry. 180.
Fifteen of the inside cylinder 4-6-0 type Nos. 1500 to 1514 had been
completed: with exception of Nos. 1513 and 1514 fitted with Robinson
superheaters) and had been completed with Schmidt superheaters. No. 1506
was hauling the Cromer to London express on Saturday 12 July 1923 when it
collided with light engine No. 471 at Colchester. This was due to signalman
error which the driver of the light engine attempted to mitigate, but Driver
Barnard, Fireman Keeble and Guard Burdett on the Cromer express were
killed.
Five new Y14 class freight engines, Nos. 542-6 had been competed: they were
fitted with both vacuum and air brakes. A four wheel shunting locomotive
with Belpaire boiler to be numbered 227 was under construction for Canning
Town goods yard. Ten of the T19 4-4-0 type were vto be further rebuilt with
new boilers and Schmidt superheaters: Nos. 707 and 775 were the first two
to be modified. No. 1850, a 4-4-0, had been fitted with Kendall's feed water
heater with the clack boxes on the smokebox.
Caledonian Ry. 181. illus.
No. 337 illustrated. Introduction ot superheating was responsible
for the evolution of J.F. Mclntosh's new design of express goods engine,
Modelled on the older 812 six-coupled class, it was found that owing to the
extra 2½ tons required for the Schmidt superheater, a front pair of
carrying wheels was absolutely necessary in order to get a good adjustment
of weight. This extra weight is largely in the neighbourhood of the smokebox
and cylinders, the latter being 19½in. diameter and fitted with piston
valves. There was also the inducement of greater safety at high speeds in
the provision of the leading truck, and since they have been in traffic these
engines had been noted for smooth and easy running. The dimensions generally
followed the 812 class, except as regards the boiler, which had a slightly
larger heating surface, due to the superheater. The leading dimensions were:
cylinders 19½in. by 26in., with piston valves 8in. diameter; coupled
wheels 5ft. diameter, pony truck wheels 3ft. 6in. diameter; boiler total
heating surface 1460 ft2, grate area 20.6 ft2.; working
pressure 160 psi.
London & North Western Ry. 181.
The remaining two four-cylinder passenger engines would shortly be
running, Nos. 1159 Ralph Brocklebank and 2046 Charles N.
Lawrence. No. 1191 of this type was stationed at Camden and worked daily
the 12.10 ex Euston to Crewe, returning with the 17.02 ex Crewe. Another
of the type, No. 1327, was stationed at Edge Hill, and ran daily to London,
leaving Lime Street at 11.00 and returning from Euston at 17.55. The first
four of a new series of 0-8-0 coal engines (Schmidt superheater) were complete:
Nos. 93, 107, 138 and 670. No. 2664 Queen Mary had been fitted with
a superheater and sandboxes placed in front of the driving splasher, like
No. 1628 Foxhound, previously noted. Several of the 4-6-2 non-superheater
tanks had been fitted with Schmidt superheaters, and probably all would be
fitted as they came into the shops. Those .now running so fitted were Nos.
1533, 1728 and 2665. No. 127 Snake (Precursor class) was running fitted
with the Weir feed pump previously fitted to No. 2494 Perseus (George
the Fifth class). Several more Precursors were being fitted with Schmidt
superheaters, and more of the four-cylinder compound passenger engines were
being altered to simple. No. 739 Sutherland (6ft. Jumbo) had its name
changed to Ostrich, to avoid confusion with that of the new four-cylinder
passenger engine Duke of Sutherland.
Personal. 181
Bertram McCrae had been appointed assistant locomotive superintendent
of the Ottoman Rys., Smyrna to Aidin.
W.E. Allison had been appointed locomorive superintendent of the Stann Creek
Ry., British Honduras.
New locomotives, Glasgow & South Western Railway.
182-3. 2 illus.
See also p. 203
The Lœtschberg Ry. 184-6. 3 illus.
Renewing and setting locomotive cylinders. 186-7. 3 diagrs.
E.L. Ahrons. The utilization of waste heat in locomotives — Trevithick's system. 187-92. 4 illus., 3 diagrs., 4 tables.
Self-propelled train for the Khedive of Egypt. 193. illus.
Described as "benzol-electric" (diesel electric) motor coach (railcar)
supplied by Allgemeine Elektricitats-Gesellschaft of Berlin. Two cars, each
of which could oprate independently. Engines were independently mounted to
isolate vibrartion from the passengers.
North Eastern Railway. Recent wagon stock. 194-8. 5 illus., 5
diagrs. (side and end elevations)
20-ton high-sided coke wagons; 40-ton bogie coal wagons built by Leeds
Forge; 40-ton bogie coal wagons built by Sheffield & Twinberrow; 20-ton
iron ore (ironstone) hopper wagon, and 20-ton coal wagons.
Petrol rail motor for Canada. 198. illus.
No. 253 (15 September 1913)
0-6-0 superheater goods engines, Great Northerm Ry. 201; 202. illus., diagr. (s. & f. els.)
Gresley J22 class Nos. 536-65, with 5ft 2in coupled wheels, 19 x 26in
cylinders with piston valves, 1230ft2 total heating surface,
238ft2 Schmidt superheater, 19ft2 grate area and 170
psi boiler pressure.
Stirling No. 1082 had been rebuilt with a larger boiler and extended
smokebox.
Great Western Railway. 201.
Star 4-6-0 No. 4045 Prince John was latest to be built. No.
111 The Great Bear was at Swindon for overhaul. 4-4-0 No. 3422 (ex No. 3712)
had been named Aberystwyth and No. 3439 (ex 3729) had been named
Weston-super-Mare. New locomotives: 43XX 2-6-0 Nos. 4321-30 and 2-6-2T
No. 4539 described as a "mineral engine".
The large 4-6-0 classes were now allowed to work to Chester and between Bristol
and Shrewsbury.
There was an accident at Yeovil Pen Mill on Friday 7 August when No. 3701
City of Bath ran into the rear of a stationary train due to its driver
failing to obey the signals.
London & North Western Ry. 201-2.
Four superheated 0-8-0 mineral engines had been completed at Crewe:
Nos. 734, 767, 1127 and 1128: the first was a "replacement" for a special
tank engine. Precursor No.564 Erebus had been fitted with a superheater
and piston valves. 4-6-2T No. 632 had been fitted with a superheater. Nos.
234 Pearl, 520 Panopea and 754 Celtic (Precursor class)
provided with new coupled wheels having large bosses and crescent balance
weights. Nos. 785, 788 and 1362 were further 4ft. 6in. tanks fitted for motor
service. All the special tank engines hitherto not fitted, were being provided
with cabs as they came into shops. No. 514, a 6ft. 6in. 2-4-0 passenger engine
had its name altered from Lawrence to Puck.
In view of the successful results obtained with Bowen Cooke's four-cylinder
passenger engines, a further ten similar engines had been put on order; also
ten more George the Fifths. The construction of 30 Prince of Wales class
(Schmidt superheater) would shortly be commenced.
No. 2664 Queen Mary, the first of Bowen Cooke's non-superheated 4-4-0s,
ten of which were built for comparison with similar but superheated engines,
had been fitted with the Schmidt superheater, and also No. 1728, a 4-6-2
tank.
One of the North London renumbered goods tank engines, No. 2633, was stationed
at Ellesmere Port (Birkenhead). Considerable progress has been made with
the work of extension to the No. 9 erecting shop at Crewe Works, which, when
completed, would be used exclusively for the construction of new
engines.
Midland Ry. 202.
A terrible disaster involving the loss of 17 lives and injuries to
12 occurred on the Midland main line on the morning of Tuesday, 2 September
at Aisgill Bridge, between Kirkby Stephen and Hawes Junction, near the borders
of Westmorland and Yorkshire, the Scotch express, which left Carlisle at
01.35 was pulled up through shortness of steam. An Edinburgh train which
left Carlisle 12 minutes later passed the signals at Mallerstang signal box,
which were set against it, and three miles farther dashed into the rear of
the first train. The last coaches ·of the first train were smashed and
the first coach of the second train piled it on to the tender of the engine.
The wreckage caught fire and this added to the difficulties the
rescuers.
Gas valve patented W.M. Still & Sons. 202.
Attention has been called to the risks of fire from gas in railway
mishaps. Although the number of accidents in which there has been a chance
that escaping gas has had something to do with them have been so few that
they have bees hardly worth consideration, especially when the enormous number
of cars equipped with gas is considered, all objections can be met by the
adoption of a simple non-return valve which inserted at the joint of the
high pressure piping with the reservoir. This valve (which has bees patented
by the firm of W. M. Still & Sons.Ld closes automatically immediately
there is a sudden rush of gas, which would be the case the event of the
connecting pipes being fractured or broken. and the flow of gas is
stopped.
Great Southern & Western Ry. 202.
First of a new and enlarged class of 4-4-0 passenger engines had been
turned from the Inchicore Works numbered 341 and named Sir William
Goulding after the chairman. Following a few of the leading dimensions:
cylinders 20 x 26in., coupled wheels diameter 6ft. 7in.
North British Ry. 202
This line was painting the numbers on their tanks and tenders like
the Midland Ry. in large numerals.
New tank engines, L. B. & S. C. Ry. 203. illus.
Photograph illustrates the first of a series of new six-coupled side
tank engines (No. 100), classed as E2, built at the Company's Works at Brighton
to the designs of L.B. Billinton, locomotive superintendent. These engines
had been designed for local goods traffic and shunting work, and were intended
to supersede older engines of this type known as Class El, built to the designs
of Stroudley, some of them dating back to the year I874. The boiler, cylinders,
motion, etc., are standard parts and duplicate with those of other classes
of engines on the line. The valve gear was Stephenson link type with D slide
valves, the cylinders and valves being lubricated by a graphite lubricator.
The feed water was heated in the side tanks by exhaust steam from the cylinders,
and is delivered to the boiler by a Weir feed pump fixed on the front end
of the left hand tank. In addition, a combination injector of the hot water
type, by Davies & Metcalfe, was fixed to the back of the firebox. The
principal dimensions of the engines are as follows: cylinders 17½ x
26in wheels 4ft 6in diameter; working pressure 170 psi; total heating surface
1100 ft2; grate area 17.35 ft2. There were five of
these engines, Nos. 100 to 104. No. 100 located at Eastbourne. The numbers
of the former Nos. 100 to 104 had been altered to 692 to 696.
London; Brighton & South Coast Ry. 203
Nos. 494 and 508, radial tank engines, were to be rebuilt, and also
No. 518 Kingswood, one of last remaining "yellow" engines, which would
lose her name. The new Moguls were nearly finished, and the two Baltic tanks
were under construction at Brighton. Nos. 364, 393 and 395 were the latest
D3 class to be rebuilt in the new style, without extended smokeboxes.
Glasgow & South Western Ry. 203
The new passenger engines illustrated in our last
issue on p. 183 were fitted with the Westinghouse brake. Another innovation
was the location of the reverse lever on the left hand side of the footplate,
and its manipulation was assisted by compressed air, the arrangement apparently
being similar to that used by Stroudley on the L.B. & S. C. Ry. Our attention
has also been drawn to the fact that this is the first ordinary 4-4-0 engine
in this country built to weigh more than 60 tons, even the N.E.R. 1328 class
weighing less.
Wantage Tramway. 203
GWR.locomotiveNo.1329, a four-wheeled saddle tank, formerly one of
the South Devon Ry. engines used at Plymouth Docks, was working on this line.
On the S.D. Ry. it was named Rook: it was built by the Avonside Engine
Co. in I874. It had outside cylinders 14in. by 18in., and wheels 3ft.
diameter.
Personal. 203.
A.L. Beattie retirement.
CME of the New Zealand Government Railways retired in 1913 and was
succeeded by H.H. Jackson.
[Midland Ry]
R.C. Archbutt of Locomotive Department appointed Locomotive Superintendent
Somerset & Dorset Ry in succssion to M.F. Ryan who had moved to the LSWR
to become Urie's Assistant. J.E. Anderson, chief locomotive draughtsman to
become Works Assistant to CME; and J.S. Symes to become chief
draughtsman.
[Great Northern Ry]
W.A.I. Emerson, former assistant to Sinclair, District Locomotive
Superintendent at Peterborough, promoted to DLS Grantham.
Old French express engine (French State Rys.) with piston
valves (System Ricour). 206-7. illus., diagr.
2-4-0 constructed in 1873 for Vendée Rys with 2.02m coupled
wheels, 440 x 600mm cylinders and 124.26 m2 total heating area.
Ricour piston valves fitted from 1884. 150 locomotives fitted with Ricour
valves between 1884 and 1894.
Compound articulated locomotive, Brazil Ry. 207. illus.
Henschel metre gauge 2-6-6-2 with 3ft 5¾in coupled wheels; 16
x 20in high pressure and 25 x 20in low pressure cylinders; 200 psi boiler
pressure and 1881.2ft2 total heating surface.
A new firing shovel. 207. illus.
With corrugations on blade
The locomotive history of the Cambrian Rys. 208-9.
2 illus.
Lists constituent companies with dates of incorporation and opening
and mileage. The main line ran from Whitchurch to Aberystwyth and was 95½
miles long: total mileage 229, mostly single track. There was a long climb
from Machynlleth to Talerddig of 14 miles with the last 3½ miles at
1 in 52/1 in 56. Locomotive superintendents were: Alex Walker whose employment
ended in 1882; William Aston who succeeded him and the then incumbent Herbert
Jones who took over in 1899. Works were at Oswestry. First six locomotives
supplied Sharp Stewart and were 0-4-2 with 5ft coupled wheels, 15½ x
22in cylinders, 873ft2 total heating surface, 13ft2
grate area and 120 psi boiler pressure. At first they were fitted with
weatherboards, but were later replaced by cabs.
4 Wynnstay WN 1146/1859 sold early
5 Montgomery WN 1147/1859 scrapped in 1893
6 Glansevern WN 1148/1859 sold early
7 Llanerchydol WN 1224/1860 scrapped in 1893
8 Leighton WN 1225/1860 scrapped in 1899
9 Volunteer WN 1226/1860 scrapped in 1899
Continued p. 233
E.L. Ahrons. The utilization of waste heat in locomotives — Trevithick's system. 212-15. 3 illus., 2 diagrs.
North Eastern Railway. Wagon stock. 215-18. 4 illus., 4 diagrs. (s. &
r. els.).
10-ton goods brake van; 25-ton long wheelbase four-wheel ballast wagon;
11-ton brake van with ballast plough; and long wheelbase brake van for permanent
way trains with lockers, tool boxes and cooking appliances.
Swedish State Rys. 218
Experiments with peat as locomotive fuel using the Ekelund system
New weighbridge, Swindon Goods Yard. 218-19. illus.
Capable of weighing long and heavy vehicles: the machine consisted of three
weigh tables and was supplied to the Great Western Railway by W. & T.
Avery.
Roman stone road in Northamptonshire. 219.
illus.
C.E. Stretton photograph of "Roman stoneway": actually installed by Telford!
See letter from Harrison Whitlock on p. 268.
Motor car vans, Paris, Lyons and Mediterranean Ry. 220.
Correspondence. 220-1.
Charles Dickens and the railway. H.L.
Hopwood
See page 100. Dullborough Town probably relates to Chatham and not
to Strood. Dickens lived at 11 Ordnance Terrace from 1817 to 1821. The playing
fields were there then, but disappeared when the LCDR was constructed.
The earliest mention of railways in Dickens is in American Notes published
in 1842 where he recorded a vile environment.
No. 254 (15 October 1913)
The Sulzer diesel locomotive. 223-4. illus.
Progress of the Schmidt superheater. 224.
Somerset and Dorset Ry. 224.
Large 2-8-0 under construction at Derby Works with boiler similar
to 1000 Class compound.
Midland Ry. 224
Garratt locomotive for the Congo Ry. 225-6. diagr. (cross sectional side
elevation)
Constructed by Société Saint Leonard of Liége
for metre gauge. Designed to burn liquid fuel and fitted with Serve
tubes.
Accelerated train service, Amsterdam-Rotterdam. 226-7. 3 illus.
London and North Western Ry. 227.
Nos: 2201 and 2378 were latest 0-8-0 mineral engines (Schmidt superheater)
built at Crewe. A new series of the same type was also under construction,
the first five would bear Nos. 43, 669, 1314, 1343 and 2117. A new series
of 4-6-0 (Prince of Wales) passenger engines (Schmidt superheater) was in
course of construction, and would bear the names of famous poets and authors.
. No. 1951 Bacchante (Alfred the Great class), had been converted
to simple with 18½in. by 24in. cylinders, and No. 2011 Brougham
(Precursor class), had been altered with a superheater and piston valves.
No. 1688 (4-6-2 tank) had been altered with superheater. Nos, 2507
Miles Mac Innes and 2512 Thomas Houghton (Queen Mary class)
had left the shops provided with the latest pattern of tender and also the
vacuum brake. Additional Precursors to be provided with new coupled wheels,
having large bosses and half-moon balance weights, were Nos. 1364,
Clyde, and 2061, Eglinton. No. 479, Mastodon (6ft. Jumbo),
had been broken up. Passenger train vehicles had their tonnage shown in large
figures. at each end of the vehicle.
New compound locomotives, Northern Railway of Spain. 228-9. 2 illus., 3 diagrams
(side elevations), table
4-8-0 (series 4001-4020) with 1560 mm coupled wheels
4-6-0 express locomotives. Bombay, Baroda & Central India Ry. Metre gauge section. 230-1.
Large 4-8-2 locomotives, Natal Section, South African Rys. 231-3. 4 illus., diagr. (side elevation)
The locomotive history of the
Cambrian.Rys. 233-4. illus., 4 diagrs
Continued from page 209
No. | Name | Maker | WN | Date | Scrapped/sold |
1 |
Enterprise | E.B. Wilson & Co. | 301 |
1851 | 1872 |
2 |
Ruthin | Manning, Wardle & Co. | 19 |
1860 | 1873 |
3 |
Milford | Sharp, Stewart & Co. | 1123 |
1895 |
|
10 |
Pioneer | Manning, Wardle & Co. | 1873 |
||
13 |
Whixall | Manning, Wardle & Co. | 36 |
1862 | 1875 |
14 |
Nantelwyd | Manning, Wardle & Co. | 45 |
1862 | 1868 |
15 |
Hereford | Manning, Wardle & Co. | 1862 | 1878 |
|
16 | De Winton | Manning, Wardle & Co. | 41 |
1862 | 1878 |
17 | Merion | Manning, Wardle & Co. | 52 |
1862 | 1878 |
18 | Cardigan | Manning, Wardle & Co. | 55 |
1862 | 1874 |
21 | Lilleshall | Lilleshall Iron Co. | 1862 | ||
23 | Tiny | Manning, Wardle & Co. | |||
24 | Borth | Manning, Wardle & Co. | 66 |
1863 | |
25 | Dwarf | Manning, Wardle & Co. |
Changing springs. 234. 2 diagrs.
E.L. Ahrons. The utilization of waste heat in locomotives Trevithick's system. 235-7. 5 illus.
The Ross mechanical lubricator. 238. diagr.
R.L. Ross of Stockport
Ash elevator for locomotive sheds. 238-9. illus.
In use at Old Oak Common shed: device employed the vacuum power provided
by the locomotves
North Eastern Railway. Goods wagons. 239-42. 4 illus., 4 diagrs. (side
& end elevations), plan.
10-ton open goods wagon (5 plank); 12-ton covered wagon; 15-ton covered
road van with four doors; 25-ton bogie covered goods wagon.
Eight-wheeled goods brake, Great Northern Ry. 243. illus.
Safety of gas lighting on railway trains. 243-4. illus., diagr.
Portable mechanical loader. 244. illus.
Roman stone road in Northamptonshire. W.B. Paley. 244.
No. 255 (15 November 1913)
Four-coupled superheater express engine, Great Central Ry. 247. illus.
No. 429 Sir Alexander Henderson illustrated
London & North Western Ry. 247.
New Prince of Wales Class 4-6-0 type: Nos. 362 Robert Southey,
892 Charles Wolfe, 1081 John Keats, 1089 Sydney Smith;
1134 Victor Hugo, 2040 Oliver Goldsmith. New 0-8-0 with Schmidt
superheaters Nos. 2195, 2246, 2258, 2390, 2452. Precursor No. 515 Champion
fitted with superheater. Queen Mary class 4-4-0 No. 1550
Westminster superheated and fitted with sandbox in front of leading
splasher (as was No, 5000 Coronstaion). No. 2500 (4ft 6in tank fitted
with motor equipment)
Great Western Ry. 248.
New 43XX locomotives: 4331-4340
Canadian Pacific Ry. 248.
Toronto branch of the Canadian Manufaturers' Association held a ball
during journey to its annual meeting in Halifax, Nova Scotia: a dining car
was converted into a dance floor. The Calgary Works were in full operation
using natural gas as a major source of power.
Tenth Annual Reunion Dinner. 248.
Of Stratfordians past and present to take place in Norfolk Room in
Great Eastern Hotel on 28 November to be chaired by R.V. Russell.
North British Ry. 248.
Large numerals on tenders and tanks of goods engines were in connection
with control system.
New passenger engine, North British Ry. 248-9. illus., diagram (side
elevation)
Ten new intermediate passenger engines (No. 258 Glen Roy
illustrated), with 6ft coupled wheels, 20 x 26in cylinders with 10in piston
valves; 1640.7ft2 total heating surface including superheater
and 21.13ft2 grate area: five locomotives fitted with Schmidt
superheaters and five with Robinson type. Numbers and namesL 149 Glen
Finnan, 221 Glen Orchy, 256 Glen Douglas, 258 Glen
Roy, 266 Glen Falloch, 307 Glen Nevis, 405 Glen Spean,
406 Glen Croe, 407 Glen Beasdale, 408 Glen Sloy. W.P.
Reid design.
New express goods engine, "Mogul" type, L. B. & S. C. Ry. 249-50.
illus.
Five 2-6-0 locomotives, Nos. 337-341 cobstructed at Brighton Works
with 5ft 6in coupled wheels, 21 x 26in cylinders with 10in piston valves;
1574ft2 total heating surface including superheater and
24.8ft2 grate area. Belpaire firebox and Weir feed pumps and a
form of feed water heating whereby excess steam was fed into tender. L. Billinton
design.
Midland Ry. 250.
More than sixty of the 483 to 562 class had been rebuilt with Belpaire
boilers and superheaters. 0-6-4T No. 2024 had been fitted with Westinghouse
brake and that several further of class were to be fitted and sent to the
Southend line The 4-6-4Ts were to be transferred away off Southend section.
No. 773 had covers fitted to its bogie wheels and an undershield beneath
the motion: speculated that this was to keep out dust. None of the American
Moguls had been repaired recently and they were expected to be withdrawn
as they entered shops. No. 1215, double-frame 0-4-4T was used as yard shunting
engine at Derby with condensing gear removed and painted black..
South Eastern & Chatham Ry. 250. diagram
(side elevation)
See also pp. 116 and 272.
Wainwright superheated 0-6-4T with 5ft 6in coupled wheels, 19½in x 26in
cylinders, Schmidt superheater and Belpaire firebox.
Personal.. 250
Wainwright resignation through ill health
Express passenger engine, Great Southern & Western Railway. 251-2.
illus.
Maunsell 4-4-0 No. 341 Sir William Goulding (name of company's
chairman) with 6ft 7in coupled wheels, 20 x 26in cylinders, piston valves
actuated by Walschaerts valve gear, total evapourative heating surface
1520ft2 plus 335.2ft2 superheater. Grate area
24.8ft2. Belpaire firebox. 165 psi boiler pressure.
Mallet locomotives for the West of India Portuguese Railway. 252-3.
illus.
Three Mallet 0-6-6-0 compounds supplied by North British Locomotive
Company to metre gaugue railway to operate over 16 miles of 1 in 40 gradient
on the Ghat section between Collem and Castle Rock. The locomotives had 3ft
3in coupled wheels; 15½ x 20in high pressure and 24½ x 20in cylinders;
1513ft2 total heating surface; 33ft2 grate area with
Belpaire firebox and 180 psi boiler pressure.
4-6-2 express locomotive for the Roumanian State Railways. 253-4.
illus.
Maffei four-cylinder simple locomotive with all cylinders driving
onto the front axle. Designed to burn oil (firing via the Dragu system) and
soft coal. 3373ft2 total heating surface, 43ft2 grate
area, Schmidt superheater (650ft2), 185 psi boiler pressure and 6ft
1in coupled wheels.
E.L. Ahrons. The utilization of waste heat in locomotives —
Trevithick's system. 254-7. 9 illus.
Feedwater heater fitted as extension to smokebox.
The locomotive history of the Cambrian Rys. 258-60.
3 illus. diagr., table
Sharp, Stewart 0-6-0 type originally delivered to Oswestry & Newtown
Railway (11, 12,19, 20, 26 and 27) and Newtown & Machynlleth Railway
(34, 35, 39, 40, 45 and 46). Three engines probably diverted to Brecon &
Merthyr Railway ewhich would have been CR Nos. 22, 32 and 33. As originally
delivered they had 4ft 6in coupled wheels, 16 x 24in cylinders,
951.5ft2 total heating surface, 14ft2 grate area and
120 psi boiler pressure. No. 34 Talerddig was renamed Cader Idris
in 1875 and No. 35 Countess Vane was renamed Castell Deudraeth
in 1864. Aston rebuilt the later locomotives with larger boilers with
1006ft2 total heating surface and cabs. The illustrations include
manufacturer's photograph of Cambria, but the rebuild type is illustrated
by No. 18 a locomotive taken over from the LNWR, but identical to
rebuilt type?
No. | Name | Makers' No. | Date built | Date rebuilt | Scrapped |
11 |
Queen | 1301 |
1861 |
1900 |
|
12 |
Prince of Wales | 1302 |
1861 |
1909 |
|
34 |
Talerddig | 1310 |
1861 |
1899 |
|
35 |
Countess Vane | 1311 |
1861 |
1899 |
|
19 |
Hercules | 1341 |
1862 |
1899 |
|
20 |
Vulcan | 1342 |
1862 |
||
26 |
Tubal Cain | 1343 |
1863 |
1900 |
|
27 |
Cambria | 1344 |
1863 |
1896 |
|
39 |
Sir Watkin | 1445 |
1863 |
1895 |
|
40 |
Cyfronydd | 1446 |
1863 |
1895 |
|
45 |
Rhiewport | 1530 |
1864 |
1896 |
|
46 |
Towyn | 1531 |
1864 |
1895 |
|
51 |
Snowdon | 1590 |
1865 |
1894 |
|
52 |
Harlech | 1597 |
1865 |
1894 |
|
1 |
Victoria | 2231 |
1872 |
1891 |
|
4 |
Alexandra | 2232 |
1872 |
1891 |
|
6 |
Marquis | 2306 |
1873 |
1895 |
|
10 |
Marchioness | 2307 |
1873 |
1894 |
|
14 |
Bronerion.. | 2511 |
1875 |
1897 |
|
15 |
Glansevern . . | 2513 |
1875 |
1888 |
In 1863 Sharp Stewart supplied three small 0-4-0ST locomotives with 4ft coupled wheels, 114 x 20in cylinders, 669ft2 total heating surface and 120 psy boiler pressure:
36 | Plasfynnon | 1431 |
37 | Mountaineer | 1432 |
38 | Prometheus | 1433 |
Improved steam sanding apparatus. 260-1- 5 diagrs.
Supplied by Holden & Brooke Ltd. of Manchester and operated either
by steam or compressed air.
Baker Street and Waterloo Tube Railway. 261.
Extension to Paddington from Edgware Road expected to open on 1 December:
Paddington station was being equipped with escalators.
Repairing a locomotiv tube plate. 262-4. 6 diagrs.
Leaks caused by cracks in firebox tube plate and in joints with tubes.
Repairs included butterfly patches, putting bushes in the holes and by cutting
sections out and replacing.
Guard's valve for vacuum brake. 264. diagr.
London & South Western Ry. 264.
Work on electrification of suburban lines began at Teddington.
North Eastern Railway. Goods wagons. 265-8. 5 illus., 5 diagrams (side
and front elevations)
12-ton open wagons (eight plank) for sleepers and 12-ton open wagons
for salt with special flooring of Adamant Asphalte; 10-ton (diagram states
8-ton) double bolster wagon and 10-ton single bolster wagon and twin bolster
wagons (permanently coupled) for carrying timber.
[Journal protection]. 268.
Protection for journals of axles against weather afforded by a coat
of good quick-drying black lacquer or spirit varnish applied with a soft
brush to a perfectly clean surface. The varnish dries hard and no moisture
can get beneath it.
[Cab windows]. 268
During rainy weather cab windows of locomotives become obscured by
the water running in isolated streams across the glass. This can be remedied
by rubbing the window with a piece of soaped waste allowing the faintest
trace of soap to remain on the surface.
Midland Railway (Derby Works) Brass Foundry. 268
Very up-to-date melting plant, including three Morgan tilting furnaces
and one Charlier furnace had recently been installed. The moulding plant
had been brought to a very high standard by the introduction of a high speed
moulding machine supplied by the Universal System of Machine Moulding &
Machinery Co , Ltd. and built by Bonvillain & Ronceray, Paris. The castings
were produced at a high grade of perfection and required practically no other
dressing than the cutting of the runners, thus showing a considerable
economy.
Great Central Ry. 268.
The last four 4-6-0 engines of the Sir Sam Fay class had recently
been named as follows: 424 City of Lincoln, 425 City of
Manchester, 426 City of Chester and 427 City of London.
Unlike No. 423, which was painted the standard passenger colour green, these
four were painted black, Nos. 424 and 426 were at Grimsby, and worked alternately
to Manchester and to Nottingham. No. 1021, 4-4-0, had been rebuilt with a
superheater, and named Queen Mary. No. 876, of the 852-881 class,
had also been rebuilt with the addition of a superheater. Together with 857,
859 and 869, it was stationed at Lincoln. All four had the Westinghouse brake
for working through trains coming from the Great Eastern.
Correspondence. 268-9
Roman stoneways. Harrison Whitlock.
Writer thought Stretton was wrong in calling the tramway on the Watling
Street a Roman stoneway. He appended an extract from a local paper the
Northampton Mercury, 23 October 1886. The Watling Street Tramway.
The rough stone tramway along the Watling Street, between Towcester and Weedon,
was done in the year 1837. The two hills were cut through at the top of each
and the earth carted into the hollow, where there is a brook and a bridge
over it called Gun Bridge. A new and stronger bridge was built in the same
year to carry the earth brought there from the hills, so as to make the road
as level as could possibly be done. On the left or near side of each hill
was then laid the present tram road. Some of the large centre stones over
which the wheels run were brought from Mount Sorrel, and a great many are
Scotch granite from Aberdeen. They were laid by Edwards, of Heyford. and
the whole of the curb stones were laid by Thomas Bishop, of Fosters Booth,
assisted by Thomas Reeve, of Cold Higham, both of whom are still living there;
and I may say that the work is as good now as it was then. The work was carried
out by the then Turnpike Commissioners, in order to enable the coaches to
compete with the railway then being made from Denbigh Hall, near Bletchley,
to Rugby. which railway opened for traffic either just before or at the time
the tram road was completed. How far it answered in such competition I must
leave the reader to judge. About 300 men were employed in this work, under,
the superintendence of Geo. Savage, now of Stoke Bruerne, who had the entire
management of the whole work, under John Judkins, of Heyford, the survevor
to the Commissioners. D.N.T." [The information was supplied to the
Mercury by D. Norman, of Towcester, and he knew all the persons
named.
Charles Dickens and the railway. A.R. Bennett. 269.
H.L. Hopwood, who writes in your September issue, was certain that
the playground referred to by Charles Dickens in his Uncommercial
Traveller was situated at Chatham and was the only one that could have
been meant, there is of course an end to the notion that Dullborough was
Rochester and the station concerned Strood. But the idea that he described
a real arrival and a real incident in his life must also be abandoned, for
whether the loop line was or was not made, the unfriendly relations between
the, two companies would assuredly have prevented a S.E.R. engine from plying
into a L.C. & D. station. Dickens must therefore have noticed No. 97
elsewhere and transported her to an impossible spot. One wonders why. If
he really made the journey and arrived at Chatham it would have been easy
to have noted the name of a L.C. & D. engine, and to have assigned the
station with its tunnel, "By Act of Parliament," to its proper owner instead
of to a rival company. He is very specific that it belonged to S.E.R. Although
without special local knowledge, I did not rashly adopt the Rochester and
Strood theory. Chatham, I knew, had a tunnel, but the other circumstances
made it impossible in my eyes, so I submitted the matter to Mr. Henry Fielding
Dickens, K.C., son of the great author, who very kindly wrote me a long letter,
of which the following are brief extracts:
"I have no doubt that the town described is Rochester. The station itself
is Strood, which was on the S.E.R., or, to speak more strictly, the North
Kent. My father spent a part of his childhood at Rochester where his father
was in the Paymaster's Office at Chatham, and I do not suppose he went back
until he took Gad's Hill, which is about two miles away. There are facts
in the article, moreover, which point to Rochester and it alone. The 'ugly
dark monster of a tunnel' is just outside and visible from Strood Station."
Then, after four pages in support of his views, Mr. Dickens winds up: "I
think you will agree with me that all these facts point to Rochester and
no other place." Of course, Mr. Dickens, like myself, had the specific statement
of S.E.R. ownership before him, which appears to automatically exclude anything
outside that company. The difficulty about the playground does not appear
to have struck him. I also communicated with the S.E.R., and their chief
engineer, P.C. Tempest, likewise expressed the opinion that Strood Station
was meant.
Replies. 269
J. M. Courage.
We understand the line from Brampton Junction to the town is now North
Eastern property. The GWR owned and worked the Liskeard and Looe and Liskeard
and Caradon lines, and the locomotives are now numbered in their list.
W. Butterfield
A modern first-class restaurant car cost £29 to £38 per
foot run complete.
Anonymous (Codanur, South India).
Both plates are tapped, the stud would not bring the plates together
when patching fireboxes. Thread the inside plate only, with a clearing hole
in 'patch, and caulk the stud.
Hubert Rankin
The GWR had a few engines fitted with the Westinghouse brake, No.
3434 was one of them.
F.F. Hoyland
Our postcard No. 1607 gives an idea of the front end of a Bloomer.
As built we understand the rasing over the firebox was bright brass, as also
were the dome and the splasher beading and the corners of the firebox, back
and front. These engines were painted vermilion, and the small valve between
the dome and firebox was this colour.
F.J. Neale
The three-cylinder Midland engines had the valves inclined 1 in 16.
The automatic vacuum brake fittings of the Sir Sam Fay class include the
Westinghouse self-regulating ejector.
F. Turton.
Of course the loading gauge limits the height of the chimneys. The
following are the dimensions requested:-Stroudley D3 class, boiler diameter
4ft. 3in., centre above rails 7ft. 59/16in.; Sirdar class,
4ft. 10in diameter, 8ft. 3in. above rails; Atlantic 37 class, 5ft. 4½in.
diameter, 8ft. 8½in. above rails.
H. Summers
Regret we cannot give early history of Bishops Castle Ry. locomotive
Carlisle. It was repaired at Wolverhampton, GWR about two years ago
.
Reviews. 269
Locomotive boiler construction. F.B. Kleinhans, with
additions by G.L. Fowler. New York: Norman W. Henley Publishing Co., London:
Locomotive Publishing Co., Ltd.
This work is a practical treatise for boilermakers, boiler users and
inspectors, and deals only with the best and most modern American practice.
The introductory chapter is devoted to a description of boilers in general,
and then the author treats of the constructional side, taking the reader
stage by stage through the various operations, commencing with the laying
out of sheets, and following with chapters on flanging and forging, machining
parts, riveting, boiler details, etc. Considerable space is given to boiler
shop machinery. The final chapter deals with the question of locomotive boiler
inspection as it is applied in America. The book is copiously illustrated,
there being 334 figures in the text and five folding plates illustrating
typical modern American locomotive boilers.
Modern railway working. J. Macaulay and Cyril Hall. Volume
VI. London: Gresham Publishing Co.
The sixth volume of this useful work contains the sections on Railway Carriage
Lighting, by Hy. Fowler, of the Midland Ry.; Electric Traction on Railways,.
by Philip Dawson, of the L.B. & S.C.R. ; and Signalling and Train Control,
by H.E. Morgan, of the W.R. Sykes Interlocking Signal Co. Three chapters
are devoted to carriage lighting requirements, and gas and electric lighting.
The section on electric traction describes comprehensively the systems of
motors, methods of control, multiple-unit control, third-rail and overhead
conductors, with a separate chapter on motor trucks, electric locomotives
and rolling
No. 256 (15 December 1913)
4-4-4 passenger tank engine, North Eastern Railway. 271. illus.
Designed to work heavy local passenger traffic in the |Darlington,
Saltburn and Tebay districts. Class D: Raven design. No. 2143
illustrated.
London & North Western Ry. 271.
Four 4-6-0 Prince of Wales class passenger engines with Schmidt
superheater had been completed at Crewe, Nos. 2075 Robert Burns, 2198
John Ruskin, 2205 Thomas Moore and 2213 Charles Kingsley.
A new series of the same type was also in course of construction, the first
of which would bear No. 321 Henry W. Longfellow, thus replacing one
of Webb's 4-6-0 four-cylinder compound mixed traffic engines, which had been
broken up. Some additional Precursors were being fitted with the Schmidt
superheater and piston valves, of which No. 1419 Tamerlane was nearly
finished. No. 2271 J. P. Bickersteth" (Queen Mary class) was similarly
fitted. The latest 4ft. 6-in. tank to be altered for motor service was No.
816, whilst, of the same type, No. 951 had been broken up. No. 2168 Henry
Maudslay (George the Fifth class) had been fitted with a Bosch mechanical
lubricator. No. 1191 Sir Frank Ree (Claughton class) had, since first
stationed at Camden, made over 100 continuous daily trips (Sundays excepted)
between Euston and Crewe.
0-6-4 tank engine, South Eastern and Chatham
Railway. 272. illus.
See also pp. 116 and 250. Wainwright Nos. 129, 207, 397, 611 and 614. Fitted with steam
reversers.
4-6-4 tank engines, Netherlands State Rys. 272-3. illus.
Six locomotives supplied by Beyer Peacock: 20 x 26in inside cylinders;
6ft 1¼in coupled wheels. S.E. Haagsma, Locomotive Superintendent.
Six-coupled bogie mixed traffic engines, London & South Western Ry. 273.
diagr. (s. el.)
Ten two-cylinder 4-6-0 locomotives under construction at Eastleigh
with 21 x 28in cylinders: Nos. 490-1 to be satuated and Nos. 482-485 to be
fitted with Schmidt superheaters and Nos. 486-489 with Robinson superheaters.
Great Central Ry. 273.
New series of 2-8-0 from Gorton: Nos. 375-81. No. 1021 Queen Mary
and Nos. 1015 and 1041 had been rebuilt with larger boilers, superheaters
and pioston valves.
Personal. 274
Mr. R.E.L. Maunsell.
274. illus. (portrait)
Appointment as chief mechanical engineer of South Eastern & Chatham
Ry. in succession to Wainwright; formerly locomotive superintendent Great
Southern & Western Ry. Includes details of his career.
Mr. John F.
McIntosh. 274.
Retirement of the locomotive, carriage & wagon susperintendent
of the Caledonian Ry.: concise biography
Mr Edward A.
Watson. 274. illus. (portrait)
Appointment as locomotive superintendent of the Great Southern &
Western Ry. in succession to Maunsell. Includes details of his career, but
without dates.
The late Mr. J.H.
Sharp. 275.
Eldest son of Rev. J.P. Sharp of Longstowe, Cambridgeshire: he was
born at Farndon in Buckinghamshire on 15 July 1860 and died on 6 November
1913 in Glasgow. Apprenticed to Sharp Stewart where his grandfather, John
Stewart, had been one of its founders. Died as Managing Director of North
British Locomotive Co., from which he had been since 1903.
Express engine, Nigerian Rys. 275-6. illus., diagr. (s. el.)
Nasmyth Wilson 4-6-0 for 3ft 6in gauge with Galloway-Hill Patent furnace
and Belpaire firebox to operate between Zaria and Lagos.
The Clogher Valley Ry. 276-9. 6 illus., map
This roadside tramway operated between Maguire's Bridge and Tynan.
It opened in May 1887. The line was characterised by sharp curves, steep
gradients and on-street sections through the main towns served. Illustrations
include works photographs of locomotives as well as locomotives and rolling
stock in service and workshops at Aughnacloy.
Number | Name | Maker/type | WN | Date |
1 | Caledon | Sharp Stewart 0-4-2T | 3369 |
1886 |
2 | Errigal | Sharp Stewart 0-4-2T | 3370 |
1886 |
3 | Blackwater | Sharp Stewart 0-4-2T | 3371 |
1887 |
4 | Fury | Sharp Stewart 0-4-2T | 3372 |
1887 |
5 | Colebrooke | Sharp Stewart 0-4-2T | 3373 |
1887 |
6 | Erne | Sharp Stewart 0-4-2T | 3374 |
1887 |
7 | Blessingbourne | Hudswell Clarke 0-4-4T | 914 |
1910 |
South Eastern and Chatham Ry. 278.
Two Ivatt 2-4-0 tender locomotives Nos. 1066 and 1067 from the Great
Northern Railway were working from Bricklayers Arms having been transferred
on Sunday 30 November via Ludgate Hill.
Superheater repairs in the running shed. 279. diagr.
[Cleaning boiler tubes]. 279.
American steam driven rotary device for cleaning boiler tubes.
Great Western Ry. broad gauge locomotives. 280-2. 5 illus.
Notes on 4-4-0 of the Victoria class introduced in 1856: Victoria,
Napoleon, Leopold, Oscar, Abdul Medjid, Victor Emmanuel, Alexander and
Otho. A second series was built from 1863: Brunel, Locke, Stephenson,
Trevithick, Smeaton, Watt, Fulton, Telford, Rennie (illustrated in original
condition) and Brindley (illustrated in modified condition with cab).
An 0-6-0 with 17 x 24in cylinders, 5ft coupled wheels and 120 psi boiler
pressure was introduced in 1851: Dido (illustrated). Druid, Hero,
Florenace, Nora, Creina, Volcano, Caesar and Thunderer. This was
followed by a further series from 1857: Mersey, Severn, Tweed, Humber,
Esk, Avon and Liffey (last illustrated). J. Armstrong introduced
an 0-6-0T (side tank) in 1865/6: Sir Watkin, Bulkley, Whetham, Fowler,
Saunders and Miles (illustrated). Theese were later converted
to saddle tanks. Bulkley, Fowler and Saunders were transferred
to the South Devon Railway and when they returned to the GWR in 1876 they
were numbered2157-9 and the names were removed. They had 4ft 6in coupled
wheels and 17 x 24in cylinders.
Some fragmentary notes on N.E. Ry engines, old and new. 282-3.
Chilled wheels for railways. 283-4. illus.
The locomotive history of the Cambrian Rys. 284-6. 3 illus., table
North Eastern Railway. Goods wagons. 286-9. 4 illus., 4 diagrs.
(side & front elevations, some plans)
12 ton plate wagon; 25 ton plate wagon; 10 ton perishable goods van
and 10 ton refrigerated goods van, cooled by ice.
Bogie saloon carriage, Midland Ry. (London, Tilbury &
Southend Section). 289-91. 3 illus., diagr. (side elevation and
plan)
Built at Plaistow under Robert H. Whitelegg's direction. Luxurious
vehicle which was capable of dining 16 and which exploited rubber to minimise
noise and vibration via Spencer Moulton body blocks and Silvertown rubber
tiles. Italian marble was used in the lavatory. Electric radiators were fitted
as well as steam heating and both Westinghouse and vacuum brake. The bodywork
was teak. Presumably when authorised it was envisaged that the vehicle would
work to destinations off the system. See
also Dow's pictorial album.
Drewry rail motor-cars, Great Western of Brazil Ry. 291-2. 2 illus.
Permanent way inspection cars.
RETURN TO Home Page Top of this Page |
 
|
Registered Charity No 290944 | Company Limited by Guarantee No 1862659 |